330 likes | 474 Views
2. Background. FTS 2001 Contracts Sprint and MCI (1998 and 1999)Traditional Telecom and Data Services Limited access to end user equipment (use Schedules and GWAC's)Bridge Contracts awarded in 2006 (Sprint and Verizon)Crossover Contracts allowed local Metropolitan Area Acquisitions (MAA) contra
E N D