180 likes | 198 Views
Detailed report on IEEE 802.15 progress, including technical guidelines, key protocol updates, and upcoming ballot resolutions.
E N D
Report on 802.15 Authors: Date: 2015-01-16 Clint Chaplin, Imagicon
Abstract Report on 802.15 as presented to 802.11
802.15.3d100 Gb/s Worked on Applications Requirements Document (ARD) (Document 15-14-0304-07-003d) This document will be used in this TG3d and SG3e as described in Document 15-14-0672-01-003d. 4 contributions were included with some modifications. Section 4 is completed, while sections 5 ~ 8 need some revision. Channel Modeling Document (CMD) (Document 15-14-0310-04-003d) Technical Requirements Document (TRD) (Document 15-14-0309-03-003d) Slide 3 Slide 3
802.15.4nChinese Medical Band First Recirculation WG Ballot LB99 on draft 3.0 closed December 3, 2014. Results 100/0/8 100.00% No comments Conditional Forwarding to Sponsor Ballot met Formed BRC for Sponsor Ballot Reviewed the timeline Scheduled teleconference Slide 4 Slide 4
802.15.4qUltra Low Power First Recirculation WG Ballot LB100 on draft 2.0 closed January 10, 2015. Results 72/13/6 84.71% Received 120 comments; 60 resolved. Set up BRC to finish addressing comments and send updated draft out for recirculation Hope to get recirculation done by next meeting Slide 5 Slide 5
802.15.4rDistance Measurement Techniques Discussions about continuation of leadership Completed Technical Guidelines Document (Result posted in doc #15-14-0297-04) Reviewed timelines for Call for Proposals Slide 6 Slide 6
802.15.4sSpectrum Resources Usage Heard 7 presentations Revised Technical Guidance Document and Call for Contributions Slide 7 Slide 7
802.15.7r1 Optical Camera Communication Finalizes CFA and home page for IEEE 802.15.7r1 Appointing officers Chairman: Yeong Min Jang (Kookmin Univ.) Vice Chairman: Rick Roberts (Intel), Yu Zeng (China Telecom) Chief Technical Editor: Rick Roberts (Intel) Technical Editor: Jaesang Cha (SNUST), Murat Uysal(Ozyegin Univ.) Secretaries: Nikola Serafimovski (PureLiFi), Rojan Chitrakar (Panasonic) Slide 8 Slide 8
802.15.8 Peer Aware Communications Completed Draft v.8 All main PHY writeup completed. Added several MAC Components Derived work items by comparing of v.7 with IEEE 802.15.4 and PAC Framework document Assigned champions for missing items and insufficient parts. Letter Ballot: May 2015 Slide 9 Slide 9
802.15.9 Key Management Protocol First Initial WG Ballot LB98 on draft 1.0 closed December 11, 2014. Results 55/7/6 88.71% Received 317 comments. Ballot Document Resolution First pass through all comments done Major contribution to improve multiplexing IE and SAP To make it work better for KMP and improve usability by other MAC layer fragmentation/reassembly uses Reformulated BRC To finish ballot comment resolution Start 15 day recirculation Slide 10 Slide 10
802.15.10 Layer 2/Mesh Under Routing (L2R) Recap Nov. 802.15 Interim and Current Status Elect Editor Review Process Tasks to Starting Letter Ballot Work on Editors Draft Have Security Discussion with TG9 (KMP) Review Timeline for Pre-Reviews Prior to March Mtg. Review Overall TG10 Timeline and Next Steps Slide 11 Slide 11
High Rate Close Proximity (HRCP) SG802.15.3e First Meeting as Study Group Contributions: New use case for 15.3e PAR and CSD (dcn: 15-15-0015-000) Gyung-Chu Sihn, ETRI Proposed change to 3e CSD (dcn: 15-15-0014-000) Gyung-Chu Sihn, ETRI Proposed change to 3e PAR (dcn: 15-15-0013-000) Gyung-Chu Sihn, ETRI Motions Approved Study Group leadership Approved r04 of PAR and CSD Slide 12 Slide 12
6TiSCH IG 802.15.4 Revision status presented to 6TISCH (doc 15-15-0034-00) Status of IETF 6TiSCH 6tisch issues discussion RPL overhead Security ReCharter 6tisch-802.15 Liaison discussion Slide 13 Slide 13
Dependable IG Went through three email responses received to the CFI Captured in 6 use cases, included in doc #0036r1 In general, the use cases contained little technical requirements Need to inquire technical details Slide 14 Slide 14
THz IG Only meets at Plenaries Slide 15 Slide 15
WNG SC Review of TG4s Spectrum Resource Usage by Shoichi Kitazawa (15-15-0028-00) No questions WNG Chair requested that attendees submit coexistence use cases to TG4s Slide 16 Slide 16
Maintenance SC IE Security Issues Security terminology ambiguities (e.g. frame counter) were discussed and corrections were defined IEs were analyzed and a table was created that categorizes each IE by frame types used and usage by PHY, MAC, or higher layer PICS PICS annex was reviewed for accuracy and consistency. Corrections were made to the entries and to the organization of the PICS tables Flow Charts and Security State Diagrams CSMA flow charts were reviewed and corrected Security state diagrams were reviewed and corrected Draft review “Snapshot” of the draft was reviewed and corrected Slide 17 Slide 17
References This document All Documents https://mentor.ieee.org/802.15/documents Current draft is in the members-only area http://www.ieee802.org/15 Members_Only_Area 802.11 members log in using 802.11 username and password Slide 18