1 / 17

802.15 Liaison Report

802.15 Liaison Report. Authors:. Date: 2013-09-20. Abstract. Liaison report on 802.15 as presented to 802.11. 802.15.4. Slide 3. Slide 3. Clint Chaplin, Samsung Electronics. 802.15.4m TV White Space.

talasi
Download Presentation

802.15 Liaison Report

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 802.15 Liaison Report Authors: Date: 2013-09-20 Clint Chaplin, Samsung Electronics

  2. Abstract Liaison report on 802.15 as presented to 802.11 Clint Chaplin, Samsung Electronics

  3. 802.15.4 Slide 3 Slide 3 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung Electronics

  4. 802.15.4mTV White Space Initial Sponsor Ballot on IEEE 802.15.4m D3.0 closed September 7, 2013. Results: 103/6/6 94.50% 388 comments received, Editorial 242, General & Technical 146 Most comments resolved Rest to be resolved by the BRC, and recirculation to be sent out Slide 4 Slide 4 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung Electronics

  5. 802.15.4nChinese Medical Band Heard updated Proposal Presentations Joint-FSK Reviewed 4n standard draft Discussed the procedure of adopting Ranging in 4N standard Slide 5 Slide 5 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung Electronics

  6. 802.15.4pRail Communications and Control Initial Sponsor Ballot on IEEE 802.15.4p D3.0 closed September 6, 2013. Results: 65/3/4 95.59% Passed 364 comments received Did not have a quorum of the BRC at this meeting Met with commenters (as practical) and worked out acceptable resolutions Slide 6 Slide 6 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung Electronics

  7. 802.15.4qUltra Low Power Completed Technical Guideline Document Issued Call For Proposals (CFP) Slide 7 Slide 7 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung Electronics

  8. 802.15.8 Peer Aware Communications 5 Proposals related enhancing and missing simulations have been presented DCN 485r0: Simulation Results for Final Proposal 15-3-0380 (Qing Li) DCN 518r0: Performance evaluation for query-based discovery (Suhwook Kim) DCN 529r0: New Simulation Results on PAC Discovery (Huan-Bang Li) DCN 486r0: Enhancing and missing simulation result for PAC operating in synchronous mode (PHY) (Hyungjin Kim) DCN 487r0: Enhancing and missing simulation result for PAC operating in synchronous mode (MAC) (Soojung Jung) 2 Proposals related channel model and TGD have been presented DCN 407r1: Comment and resolution to TGD (Marco Hernandez) DCN 492r0: Comment and resolution for system level simulations in TGD (Marco Hernandez) 4 proposals related technical issue have been presented DCN 508r0 : multi channel operation (Jinyoung Chun) DCN 553r0 : Technical Discussion on Peer Discovery (Seung-Hoon Park) DCN 557r0 : Interference Avoidance Issues for the Distributed Controlled Multiple Peer Networks (Seong-Soon Joo) DCN 559r0 : Revisit the Rational of Fully Distributed Coordination (Seung-Hoon Park) Discussion on “Template of Proposal Categorization” Doc. 427r3: Byung-Jae Kwak, Shannon Park Continuing discussion on “Summary of E-mail Discussion on PAC technical Issues” DCN 520r5: Byung-Jae Kwak, Shannon Park Slide 8 Slide 8 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung Electronics

  9. 802.15.9 Key Management Protocol Did not meet Slide 9 Slide 9 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung Electronics

  10. 802.15.10 Layer 2/Mesh Under Routing (L2R) First meeting as Task Group Discussed Sept. 802.1 Interim Planned for Nov. Joint Session w/ 802.1 Developed Material for Nov. Joint Session w/ 802.1 Developed Contributions Request for 802.1 for Nov. Developed Initial Requirements Developed Initial Timeline Generated Action Items List Slide 10 Slide 10 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung Electronics

  11. Better Use of Spectrum Resources in WPANs (SRU) SG First meeting as Study Group Hear presentations Discuss PAR, 5C and Timeline Creation of SRU Home Page SG SRU press release Slide 11 Slide 11 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung Electronics

  12. THz SG Met for the first time as Study Group Contributions Contribution #1 : Thomas Kürner, TU Braunschweig (Germany), SG Inauguration/Tasks of SG; (Document 15-13-0524-02-0thz) Contribution #2 : Cai Yunlong, Huawei (China) ,“Data Center Traffic Characteristics and 100Gb/s Demand”; (Document 15-13-0519-00-0thz) Contribution #3 : Rick Roberts, Intel (USA), A Terse Protocol Layer Tutorial; (Document 15-13-0545-0thz) Contribution #4 : Rick Roberts, Intel (USA), “Suggested draft text for SG 100G PAR and 5C “; (Document 15-13-0504-0thz) SG Leadership has been completed: Chair: Thomas Kürner (TU Braunschweig) – already appointed at July Plenary Vice-Chair: Iwao Hosako (NICT) – Straw Poll 9 yes/0 no /1 abstain Secretary: Cai Yunlong (Huawei) – Straw Poll 10 yes / 0 no / 0 abstain Technical Editor: Rick Roberts (Intel) – Straw Poll 10 yes / 0 no / 0 abstain Press Release on the formation of the new study group has been discussed. Initial Working Draft for PAR and 5C have been created (Documents 15-13-0522-01-0thz and 15-13-0523-01-0thz, supporting Document 15-13-0561-01-0thz,) Work on the Technical Expectation Document (TED)“. The content of the TED has been discussed and updated (Document 15-11-0745-10-0thz) Slide 12 Slide 12 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung Electronics

  13. LED IG Presentations Contribution 1 - The CamCom LLC Dilemma (15-13-0502-00-0led) Contribution 2- Study Issues for MIMO based CamCom System (15-13-0528-01-0led) Contribution 3- Smart Device based LED Communication examples (15-13-0532-00-0led) Contribution 4 - Development Issues for LED-ID Services Using CamCom (15-13-0530-01-0led) Contribution 5 - Energy Efficient LED light Control using Object based sensor (15-13-0531-00-0led) Completed Call for Applications document (15-13-0555-00-0led) Walk-through of 15.7 standard Initial discussion about PAR and 5C Main focus of IG-LED and SG-LED: Camera Communications LBS(location based service) LED-ID applications (digital signage applications) MIMO (Multi array LED) Slide 13 Slide 13 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung Electronics

  14. Dependable IG Did not meet Slide 14 Slide 14 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung Electronics

  15. WNG SC No presentations Slide 15 Slide 15 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung Electronics

  16. Maintenance SC Final review of SC-mag conclusions at the July plenary: extension range of values of the 802.15.4 Frame Types define a mechanism suitable for allocation/management of 802.15.4 IE IDs for all requests including external SDOs review the Information Element TLV structure disconnect with ETSI and propose a resolution Discussion on proposal for Assigned Numbers for resource identifiers Discussion on future 802.15.4 revision: efforts, plans, assignments Slide 16 Slide 16 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung Electronics

  17. References This document All Documents https://mentor.ieee.org/802.15/documents Current draft is in the members-only area http://www.ieee802.org/15  Members_Only_Area 802.11 members log in using 802.11 username and password Slide 17 Clint Chaplin, Samsung Electronics

More Related