An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SPS Days 2001-Controls issues M. Albert SL/OP PCR Software Meeting - 16/3/2001

  2. Outline • NAOS(=New Analog Observation System) • Control of Transfer Lines TI2/TI8 • Miscellaneous PCR Software Meeting - 16/3/2001

  3. NAOS (1/2) • Upgrade of trigger system • initiated after removal of ViewKick • specification transmitted to SL/CO in December 2000, but NO response yet • if no implementation for SU 2001: • remaining jitter = 60ns (internal TG8 clock) • NO verification of RF prepulse reception(this feature was very useful) PCR Software Meeting - 16/3/2001

  4. NAOS (2/2) • Decisions are needed on : • software support by SL/CO • continuation of collaboration between PS and SL to guarantee system functionality • or launch a study to find a replacement tool for it PCR Software Meeting - 16/3/2001

  5. Control of TI2/8 • All transferlines must be controlled by the same software suite which should be part of the SPS control system. • Feasibility study for TZ extension by G.Arduini PCR Software Meeting - 16/3/2001

  6. Planning (reminder) • Start-up 2003: LSS4 extraction ready • Cold check-out • Fast extraction tests to TED400353 with CNGS and LHC beams • Spring 2004: LSS6 extr. + TI8 ready • Cold check-out • Fast extraction (LSS4) to TED87765 in TI8 • Injection tests in LHC sector • Fast extraction tests to west TED with LHC beams PCR Software Meeting - 16/3/2001

  7. TZ extension - how ? (1/2) • Speed-up matching and reload (part of ‘maintenance work’ on SW and TZ-DB) • Allow more resident sequences in HW(ROCS, timing) • Foresee economy options for LHC lines • Beam instrumentation (must be done anyway): • Get rid of acquisition delays (acqu. Server, TZ DB) • Need to rewrite measurement black boxes (couplers, SEM, BCTs, OTRs(?)) – TZ PCR Software Meeting - 16/3/2001

  8. TZ extension - how ? (2/2) • Interlocks • The new and most important part ! SPS2001 Interlock Handler, with higher priority at least for the beam and HW interlocks • Delegate more responsibility to the equipment ! (PC, BI)  key point for success • Need to implement ‘sanity check’ – TZ • Need to implement kicker control – TZ • Interface to LHC (beam parameters) • Keep SL Equip alive PCR Software Meeting - 16/3/2001

  9. Miscellaneous • JAVA interface for:SPS Selection & Transfer Selection • ADS for SPS (for data file saving)will probably be done by SL/OP with advise from SL/CO PCR Software Meeting - 16/3/2001