1 / 11

Existing Capacity Qualification February 2008

Existing Capacity Qualification February 2008. Robert B. Burke & Eric Winkler ISO New England Inc. DRWG - February 14, 2008. Existing Capacity Qualification. Important Dates Resources ready-to-response as of February 8, 2008 ODR registered and active as of February 8, 2008 FCTS Training

moswen
Download Presentation

Existing Capacity Qualification February 2008

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Existing Capacity QualificationFebruary 2008 Robert B. Burke & Eric Winkler ISO New England Inc. DRWG - February 14, 2008

  2. Existing Capacity Qualification • Important Dates • Resources ready-to-response as of February 8, 2008 • ODR registered and active as of February 8, 2008 • FCTS Training • Monday, February 11, 2008 • Friday, February 15, 2008 • Existing Qualification • MIS Report Released: 2/14/2008 • ftp://misftp.iso-ne.com/ • SP_EXISTCAPQUAL • Challenge Period: 2/14 – 29 • ISO Review: 5 business day • Final MIS Report Released: 3/7/2008

  3. SP_EXISTCAPQUAL(part 1) No longer used

  4. SP_EXISTCAPQUAL(part 2)

  5. What Can You Challenge? • Summer Capacity • Winter Capacity • Resource Type • Provided not under multi-year commitment

  6. Supporting Data Requirement • Summer Capacity • Increase or Decrease • In text box provide short explanation • Attached supporting analysis and documentation (i.e., Excel, Word) to justify the change • Winter Capacity • Increase or Decrease • In text box provide short explanation • Attached supporting analysis and documentation (i.e., Excel, Word) to justify the change • Resource Type • Provided not under multi-year commitment • Short explanation in text box

  7. Example Data • For new Existing Resources (5/1/07 to 2/8/08) • Capacity is shown as 0 • Transition ICAP in the Real-Time Demand Response Program is based on the maximum reduction in any 5-minute interval • In FCM capacity will be based on Average Hourly performance over multiple events in a month • Summer: June, July, August • Winter: December, January • Therefore, ICAP values established on August 15, 2007 may not be representative of a RTDR, RTEG or Critical Peak Resource’s Summer or Winter Capability in the FCM

  8. Supporting Analysis & Documentation • Market Participants should use a combination of historical load and performance data, as well as their understanding of the end-use loads being controlled to estimate an asset’s Summer and Winter Capability. • Below are some questions a Market Participant should be prepared to answer to justify their Summer and Winter Capability estimates: • Are the loads being controlled constant on a day-to-day and month-to-month basis? If so, how does the Market Participant know the loads are constant? • Are the loads being controlled dependent on the season, production levels or other loads at the facility or other exogenous factors? If so, what is the relationship between the loads being controlled and the other factors? • What is the coincidence of the controllable loads with the expected FCM performance hours (i.e., Forecast Hours, Shortage Hours, On-Peak Hours)?

  9. ODRs with FCM #1 Obligations • Many Current ODR projects have both existing and new obligations in the FCM #1 • Must ask if current MW in DR tracking system are all obligated to FCM #1. • If current MW are built to fulfill FCM #1 obligation • Be careful not to double count • Could end up with more obligation than you can deliver

  10. ODR Example (continue) • In the case where you have: • 8 MW current ODR project (project 9xxx) • 1 MW Existing Capacity Obligation in FCM #1 (asset #1234) • 14 MW New Obligation in FCM #1 (asset 5678) • MIS Report • 9xxx  0 MW • 1234  1 MW • 5678  14 MW

  11. ODR Example (continue) • In the case where you have: • 8 MW current ODR project (project 9xxx) • 1 MW Existing Capacity Obligation in FCM #1 (asset #1234) • 14 MW New Obligation in FCM #1 (asset 5678) and • Can deliver 17 MW by FCM #1, more than the 14 MW that cleared in the auction. • MIS Report • 9xxx  2 MW • 1234  1 MW • 5678  14 MW