UO Lewis Integrative Science Building - Schematic Design

This meeting will discuss the budget and design status of the UO Lewis Integrative Science Building, along with the schedule and next steps. It will cover various aspects such as sitework, building envelope, interior finishes, systems, and more.

msowers
Download Presentation

UO Lewis Integrative Science Building - Schematic Design

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. UO Lewis Integrative Science BuildingCUG Meeting - Schematic DesignWednesday, October 7

  2. Agenda • Budget Status • Design Status • Schedule • CPC planning • Next Steps

  3. Adjustments • Sitework • Site Boundaries • Building Size • Basement • Fourth Floor • Streisinger Rooftop • Building Envelope • Glazing • Penthouse Cladding • Lightwells • Skylights • Interior Finishes • Glazing • Ceilings • Systems • Lighting • Laboratories • General • Basement Labs • Shell Space • Contingencies

  4. Site Development

  5. Plan Development

  6. BASEMENT PLAN

  7. SECOND FLOOR PLAN

  8. THIRD FLOOR PLAN

  9. FOURTH FLOOR PLAN

  10. PENTHOUSE FLOOR PLAN

  11. ROOF PLAN

  12. Building Development

  13. North South

  14. West East

  15. Aerial View from North East

  16. Aerial View from North West

  17. Street Level View from North

  18. Street Level View from East

  19. View from Huestis Hall Roof

  20. View from Science Green

  21. Section View – “Up-and-Over” Connection

  22. Cut-away View – Science Green Connection

  23. End

  24. Schedule • Campus Planning Meeting – October 12 • Schematic Design Report • Design Development – User Meetings • Design Schedule • DD Oct 09 – Feb 10 • CD March 10 – Sept 10 • Permitting & Bidding • Phased Bid Packages • Construction Start Target

  25. Details • Campus Planning Meeting • SD approval process • Project Website http://www.uoregon.edu/~eeng/lisb.html • Other?