430 likes | 446 Views
Discussion points, updates on NWP Test Suite for COSMO and ICON-LAM, new COSMO versions, model documentation, and GPU-related issues. Meeting held in Offenbach am Main, Germany on February 5-6, 2019.
E N D
COSMO Scientific Management Committee Meeting 5-6 February 2019, Offenbach a. M., Germany Discussion points, some useful info, etc. (dmiitrii.mironov@dwd.de) COSMO SMC Meeting, 5-6 February 2019, Offenbach a. M., Germany
2. NWP Test Suite • COSMO-model version 5.05: results obtained so far, problems encountered, work to do, resources at ECMWF (Massimo, Flora, Uli) • NWP TS for COSMO: Andrea is at ECMWF, Ines takes over the job, etc. (Ines, all) • NWP TS for ICON-LAM: set-up (hindcast or/and series of forecasts, etc.), the need for ICON-LAM SP runs (cf. ICON global physics that is always DP), co-ordination of COSMO consortium and DWD-MPI activities, time line (all)
3. New COSMO versions, model documentation, common ICON-COSMO physics • New COSMO-model versions, presentations by Uli • From minutes of September 2018 SMC meeting (to refresh your memory) • POMPA: port of Assimilation and LHN (already in 2018) 5.05b • Radar forward operator (EMVORADO) (hopefully, in 2018) 5.05c • still needs some technical clean up and documentation • tests at DWD are ongoing • Higher order horizontal discretizations (by end of 2018) 5.05d • already available, see plans by WG2 • Mire parameterization 5.05d • Ground water runoff (by Linda Schlemmer, if port ready before end of 2018) 5.05d • Technical modifications from data assimilation [extension in the observation processing (tower data)] 5.05d • Urban module (tests in PT AEVUS are ongoing) 6.0 • Unification with CLM Version (work in progress) 6.0
3. (cont’d) New COSMO versions • From minutes of September 2018 SMC meeting • Moreover there are other technical issues • COSMO-EULAG: code and documentation available. Timeline for implementation will be discussed by SMC • Removal of coarse radiation grid (perhaps 5.06, work in progress) • Optimization of copy-in/copy-out (perhaps 5.06) • Use of CLAW directives to optimize physical parameterizations for GPU • GPU Port for Tiedtke-Bechtold convection
3. (cont’d) Mire parameterization • Results from recent parallel experiment performed by Jürgen Helmert (presented by Dmitrii) here • Discussion
3. (cont’d) Model documentation • “Supplements” to our “core documentation” are currently placed under “miscellaneous” but a better solution is desired (issue raised by Uli Blahak) • Documentation of Matthias and Guenther’s (Zängl) extensions implemented into turbulence scheme (Matthias) • Single-column model documentation (Matthias) • DOI for COSMO Technical Report and Newsletters (Dmitrii) • Improvements re. COSMO Newsletters (recall discussion at September 2018 SMC meeting) • Model documentation in view of the advent of ICON-LAM. Any comments, thoughts, suggestions?
3. (cont’d) DOI for COSMO publications • Assign DOIs via DWD • DWD is already a member of DataCite • We (WG6, NMA colleagues) get DOIs using the DWD membership, extra password needed (DWD should agree, DM finds out shortly) • Landing page is that of the DWD library (access through COSMO web via link) • Publications are “frozen” once DOI is assigned • Assign DOIs via one of the COSMO members (e.g. NMA) • Must be a legal entityto become a member of DataCite (or other agency) • Landing page is at the COSMO web • COSMO folks can do small editorial changes in published texts • Life expectancy of COSMO web?
5. GPU and related issues, single precision issues • Presentation by Xavier • Discussion • Any critical points related to ICON-LAM?
6.-12. All WGs: gentle reminder • WG leaders should make sure that the publication list is up to date and, importantly, that the entries are formatted in a unified way with no information missing • Participants of various meetings (COSMO GM, ICCARUS) should upload their presentations, WG leaders should make sure that it indeed happens (e.g. one COSMO GM 2018 plenary talk and WG2 and WG3a parallel-session talks are missing) • (address Massimo and Theodore for assistance as to the web)
6.1. WG1, KENDA-O • Presentation by Christoph • Discussion • DACE and bufr2netcdf as COSMO software, any news (c/o Christoph and Chiara, respectively)? (I list these issues here referring to the discussion at the previous SMC meeting and to the respective minutes. Hope it is OK with you, Christoph. If not, we can address these issues within other blocks, e.g. WG6 or AOB.) PP KENDA-O (Christoph Schraff) • Runs until: Aug 2020 • Info at COSMO web: OK • FTEs: no FTEs for Sep-Nov 2018
8.1. WG2, CDIC*, CELO*, EX-CELO, CCE • Presentation by Michael • Discussion
8.1. WG2 (cont’d) • PP CDIC (Michael Baldauf) • PP completed in Aug 2018 • Final report pending • Please check info at COSMO web, incl. the FTE tables • PT CELO (Bogdan Rosa) • PP completed in Aug 2018 • Final report pending • "Project resources" summary at the top of PP page is missing (see other PPs as examples) • FTE tables OK
8.1. WG2 (cont’d) PP EX-CELO (Zbigniew Piotrowski) • Runs until: Sep 2019 • Info at COSMO web: OK (but please update “Project resources” at the top of PP page, incl. PP duration, FTEs used, etc.) • FTEs: no FTE entries • PT CCE (Damian Wojcik) • Runs until: Sep 2019 • Info at COSMO web: OK (PT plan of 07.08.2018 is available) • FTEs: no FTEs for Sep-Nov 2018
8.2. WG3a, ConSAT*, T2(RC)2 • Summary by Matthias (here) • Discussion
8.2. WG3a (cont’d) PT ConSAT(Matthias Raschendorfer) • Runs until: PT completed (note that ConSATwas neither considered nor approved by the STC in 2017, so formally it did not exist as PT) • No information at the COSMO web, no FTE table entries; would be good to provide some information, e.g. a brief summary of the work performed
8.2. WG3a (cont’d) PP T2(RC)2 Phase 2 (Harel Muskatel) • Runs until: Sep 2019 • Info at COSMO web: OK • FTEs: OK
8.3. WG3b, CALMO-MAX, TERRA Nova, AEVUS, SAINT • Presentation byJean-Marie • Discussion • Status of Matthias’ implementation of the canopy layer
8.3. WG3b(cont’d) PP CALMO-MAX (Antigoni Voudouri) • Runs until: Sep 2019 • Info at COSMO web: OK (more information at the WG3b page, update as needed) • FTEs: no FTEs or Sep-Nov 2018 • PT TERRA Nova (Yiftach Ziv) • Runs until: Feb 2019 (completed?) • Info at COSMO web: OK (PT plan of 08.08.2018 is available, more information at the WG3b page, update as needed) • FTEs: OK(please check as the PT is finalized)
8.3. WG3b(cont’d) PT AEVUS (Paola Mercogliano) • Runs until: Jun 2019 • Info at COSMO web: OK (more information at the WG3b page, update as needed) • FTEs: no FTE entries for many 3-month periods (please check/provide with due regard for delays) PT SAINT (Sascha Bellaire) • Runs until: May 2019 (or longer, re. work plan 01.2019? if so, extension approved?) • Info at COSMO web: OK (PT plan of 08.08.2018 is available, more information at the WG3b page, update as needed) • FTEs: no FTEs for Sep-Nov 2018
8.4. EXTPAR, TERRA Stand Alone, Fieldextra • Presentation by Jean-Marie • Discussion • v5.0 status, output in NETCDF format vs. GRIB1/2 format
10.1. WG4, CORSO-A* • Presentation by Anastasia • Discussion • Some points discussed during September 2018 SMC meeting • collection of cases where model fails (different COSMO countries, forecaster feedback, active participation of WG4 team members) • participation of some group members in WG4 activities is not yet sufficiently active • PP CORSO-A (Gdaly Rivin, Inna Rozinkina) • PP completed • Final report pending
10.2. WG5, INSPECT*, CARMA • Presentation by Flora • Discussion
10.2. WG5 (cont’d) • PP INSPECT (Flora Gofa, Anastasia Bundel) • PP completed in Dec 2017 • Final report is available at COSMO web • Info at COSMO web, incl. the FTE tables, OK PP CARMA (Amalia Iriza-Burca) • Runs until: Mar 2020 • Info at COSMO web: OK • FTEs: OK (FTE tables prepared)
10.3. WG7, SPRED*, CIAO*, APSU • Presentation by Chiara • Discussion
10.3. WG7 (cont’d) • PP SPRED (Chiara Marsigli) • PP completed in Feb 2018 • Final report pending • Info at COSMO web, incl. the FTE tables, OK (but please check the FTE tables and FTE summary) • PT CIAO (Andrea Montani) • PT completed in Dec 2018 • Would be good to get a final report (brief summary of results) • FTE tables OK (but please check the FTE tables and FTE summary)
10.3. WG7 (cont’d) • PP APSU (Chiara Marsigli) • Runs until: Aug 2020 • Info at COSMO web: OK • FTEs: OK
12.1. WG6, POMPA*, CEL-ACCEL, IMPACT, COSMO web site, LEPS Meteograms • Presentation by Massimo • Discussion • COSMO web • SPM should update "COSMO Events" page • Completed PPs and PTs should be move to "Past, completed Projects" at the COSMO web
12.1. WG6 (cont’d) • PP POMPA (Xavier Lapillonne) • PP completed in Jul 2018 • Final report pending • Info at COSMO web, incl. the FTE tables, OK • PP CEL-ACCEL (Zbigniew Piotrowski) • Runs until: Sep 2019 • Info at COSMO web: OK (but please update “Project resources” at the top of PP page, incl. PP duration, FTEs used, etc.) • FTEs: no FTEs for Sep-Nov 2018
12.1. WG6 (cont’d) • PP IMPACT (Carlos Osuna) • Runs until: Sep 2022 • Info at COSMO web: no information, PP page is not yet created • FTEs: no entries, FTE tables not yet prepared • PP WG6-SPRT (Massimo Milelli) • Runs until: permanent • Info at COSMO web: OK • FTEs: OK
13. COSMO-CLM • Presentation by Christian • Discussion • Some issues raised during September 2018 SMC meeting (see minutes for details) • Strengthen collaboration between COSMO NWP and CLM teams (e.g. collaboration of WG5/WG4 with CLM community on rare/extreme events) • Encourage COSMO developers to use couplers • Learn from CLM experience as to the atmosphere-ocean coupling
14. ICON-ART, COSMO-ART • Presentation by Bernhard • Discussion
16. PP C2I • Presentation by Daniel • Discussion
16. PP C2I (cont’d) • PP C2I (WG6, Daniel Rieger) • Runs until: Mar 2022 • Info at COSMO web: OK (lots of info, constantly updated as needed) • FTEs: OK
17. ICON-LAM for COSMO members: Development, Gate Keeping, Git, Gitlab • Presentation(s) by Daniel and Xavier to inform the SMC members about the problems and ongoing discussions/negotiations (DWD, MPI-M, DKRZ, MeteoSwiss) and to initiate discussion • … • Discussion
18. Next SMC meetings • Do we need teleconferences in 2019? (September 2018 SMC meeting: a virtual meeting in May-June is consider to be useful.) • Should all SMC members have the right to vote, or the WG coordinators only as it is the case now? (September 2018 SMC meeting: the issue is raised but no recommendation) • Any changes with respect to the format and schedule of SMC meetings? • Other suggestions?
19. New PPs and PTs • PP AWARE (Flora, Anastasia) • Other suggestions?
20. Any other business • Suggestions towards re-organization of COSMO GM … • Consider holding parallel session before plenary session on Tu. This gives all WG, PP and PT leaders a chance to summarize the outcomes of their (parallel session) meetings and adjust their plenary talks. • Avoid to long (40-60 min) talks by one speaker, better give less time to a number of speakers.
20. Any other business (cont’d) • COSMO to ICON-LAM transition and related issues, strategic thoughts as to the Consortium future • … • Please put forward your ideas!
20. (cont’d) Thoughts by Andrzej W. (email of 8 September 2018 following discussions at the SMC meeting in St. Petersburg) I would like to add some thoughts on the COSMO activities in the frame of time 2019-2020+ in relation to the recent COSMO Science Plan 2015-2020. In the SP we mention on several occasions about the potential capabilities of COSMO model (and implicitly ICON) for a high resolution deterministic weather forecasting going down to 500m spatial resolution, which was then planned for an operational work around 2020. From my knowledge there were so far just several experiments at the resolution below 1000m (even down to ~100m resolution) by using both ICON-LAM and COSMO-EULAG. So I think it is about a time to explore these areas in a more coordinated way. If possible I would like you to discuss possibility for starting such an effort. My idea would be to stir some kind of collaborative project between teams working with ICON-LAM and COSMO-EULAG in the frame of WG2 (maybe also in collaboration with WG3x, WG5, etc.) . As you have noticed all the development for COSMO-EULAG should be finalized around sept 2019 and then more resources should be available to perform additional/new tasks.
20. (cont’d) Thoughts by Andrzej W. My idea is to prepare at least one year PT project which would explore capabilities of our models (ICON-LAM/COSMO-EULAG) to perform NWP at the spatial resolution below 1000m (500m or even below). The tests may include real time or more idealistic simulations, including areas with steep topography, coastal or maybe even urban environments. I see the outcome from this project would provide us more information about model/s: - NWP verification scores in the winter and summer time conditions - changes in computational performance for the different resolutions - stability limits for different environmental conditions (e.g. max time step, parameters controlling the physical parametrizations, etc.) - ability to represent severe phenomena related to deep moist convection/wind - identification of deficiencies in physics and numerics which would constitute a base for further actions to be planned in the science plan 2020-2025. Of course above are only my personal thoughts, you can feel free to discuss these issues within SMC/WGs and come up with your own plan.
Thanks for your efforts! COSMO SMC Meeting, 5-6 February 2019, Offenbach a. M., Germany