An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Data Communications Implementation Team (DCIT) DCIT #9 Meeting 09/21/2011 To: DCIT By: Gregg Anderson

  2. Agenda • Welcome – Gregg Anderson • Introductions & Roll Call – Jerry Smith • DCIT Minutes & Action Items Review – Jonathan Rappaport • DCL Trials Review – Craig Morris • Decision Lens results – Gregg Anderson • DCL end-to-end scenario review – Rob Mead • Ground test facility – Gregg Anderson • DCIT Working Group Reports – Andy Fry, Jerry Smith • Cockpit Demo – John Gonda • Open Discussion – Gregg Anderson

  3. Data Communications Implementation Team (DCIT) Welcome – Gregg Anderson

  4. Data Communications Implementation Team (DCIT) Intro & Roll Call – Jerry Smith

  5. Data Communications Implementation Team (DCIT) DCIT #8 Minutes and Action Item Review – Jonathan Rappaport

  6. Data Communications Implementation Team (DCIT) DCL Trials Review – Craig Morris

  7. DTAP Status • Data Comm Trials Automation Platform (DTAP) acquisition in process: • Modifies COTS to provide DCL over FANS • Minimizes platform/software development to the extent possible • S/W development and automation platform to meet safety and operational requirements • Planned acquisition in two steps • Engineering to be awarded shortly • Development and fielding to be awarded after engineering complete • Acceptance testing in summer 2012 • Supports FY12 trial IOC and all planned trial sites • Fully coordinated with DCIS contract activity

  8. Data Communications Implementation Team (DCIT) Decision Lens Results – Gregg Anderson

  9. Site Selection – Decision Lens Status • Decision Lens panel vote complete: • Training / Agreement on criteria held 9/14 • Actual conduct of voting on 9/15 • Trials sites order in attached • Next Steps: - Trials team to confirm final site availability with FAA Service Area and facility management officials • Final order/selection coordination with airlines and FAA Management planned • Final Selected facility/operator for Site #1 outreach planned for MOU development during 11/11

  10. Lens – Vote #1UAL/COA IAD Preference Weighting

  11. Lens – Vote #2 (Final)UAL/COA IAD Preference Removed

  12. Data Communications Implementation Team (DCIT) DCL End-to-End Scenario Review – Rob Mead

  13. Data Communications Implementation Team (DCIT) Ground Test Facility– Gregg Anderson

  14. Would a ground test facility be economically beneficial A Ground test facility could provide the following benefits: • A representative ground test facility in accordance with AC 20-140A, necessary for regulatory validation compliance. • An avionics engineering development test tool for interoperability/functionality. • A representative ATC Data Comm end system that would potentially minimize regulatory oversight by allowing a ground-to-ground connection between avionics and ATSU.  This may afford a reduction in aircraft cert office imposed lab, ground and flight testing in support of type design and flight standards inspector operational approvals. • Ability to create an FAA monitoring and reporting system allowing for early identification of deficiency reports that may impact our ground and airborne standards (i.e. SC214/WG78).

  15. DCIT Working Group Results – Andy Fry, Jerry Smith Data Communications Implementation Team (DCIT)

  16. Data Communications Implementation Team (DCIT) Cockpit Demo – John Gonda

  17. Data Communications Implementation Team (DCIT) Open Discussion – Gregg Anderson

  18. Letter of Commitment Submissions