1 / 9

Data Communications Implementation Team (DCIT)

Data Communications Implementation Team (DCIT). Data Communications Implementation Team (DCIT ) DCIT #31 PLENARY DCL Trials Update 3/13/2014 Matt Maki DCL Trials Lead. DTAP Build 7.1 Schedule Update. Build 7.1 Limited Climb Via SID Compliance: Interim Build with KEWR focus

wyome
Download Presentation

Data Communications Implementation Team (DCIT)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Data Communications Implementation Team (DCIT) Data Communications Implementation Team (DCIT) DCIT #31 PLENARY DCL Trials Update 3/13/2014 Matt Maki DCL Trials Lead

  2. DTAP Build 7.1 Schedule Update • Build 7.1 Limited Climb Via SID Compliance: • Interim Build with KEWR focus • UM169 CVS UL when MAINT ALT Set to NONE • National 7110.65 CVS ATC Implementation set for April 3 • Trials will seek EWR/MEM CVS DTAP waiver thru May 15 • EWR ATC FAT Input Planned • Build 7.1 Estimated Schedule: • April 14-15: FAT at Thales • April 16: Install at FAATC • April 17-25: Testing at FAATC • April 28 - May1: Install and SAT at MEM and EWR (Parallel installs)

  3. DTAP Build 7.2 Schedule Update • Build 7.2 Full Climb Via SID Compliance: • Compliance with full 7110.65 CVS Changes • CVS, CVS Except Maintain, Maintain ALT Selections • Longer WJHTC lab testing period expected due to CVS scale • Build 7.2 Estimated Schedule: • June 11-12: B7.2 FAT at Thales • June 13: Install at FAATC • June 16 - July 3: Testing at FAATC • July 7-10: Install and SAT at MEM and EWR (Parallel installs)

  4. KEWR DCL Trials Status Update • UAL, FDX MD11/B777 Daily Ops Ongoing: • Open OPR reports diminishing • UAL FRC DCL Filing Error Reductions • Resuming of UAL B767 ops expected next month+ • UPS Starts Daily MD11/B767 Ops March 15: • Approx. 24 Ops/week expected • AFS-50/400/2P Approval letter to UK CAA pending: • BAW, SAS, DLH CAA Approval letters back to FAA pending • BAW approval expected first

  5. KEWR DCL Trials Status Update • NetJets Trials Participation at KEWR: • NetJets confirmed interest in participating • Kick off Telcon set for March 19 with AOC and Pilot Reps • Bombardier Global Express 5000/6000 aircraft FANS equipped • Bombardier Challenger 350 FANS/VDL2 upgrades expected in July • 1-2 DCL flights/week from KEWR expected • March 1-4 ZNY 72 HR ERAM Testing Complete: • Test was successful • Next 72 HR ERAM run expected April 5-8

  6. KMEM DCL Trials Update • DTAP Running Stable: • Unplanned Recons minimized – 1 event since last DCIT • Server 1, 2 Re-starts On-going (Tues/Fri) • DTAP Processing 20-40 FDX DCL ops per push • Route Revisions remain minimal/none in #s • MEM ATC confirms use of CVS phraseology: - Planned CVS waiver will include MEM

  7. DCL Ops Advantages During Upcoming SWAP Season

  8. Questions ? KUSA

More Related