Data Communications Implementation Team (DCIT) Data Communications Implementation Team (DCIT) DCIT #31 PLENARY DCL Trials Update 3/13/2014 Matt Maki DCL Trials Lead
DTAP Build 7.1 Schedule Update • Build 7.1 Limited Climb Via SID Compliance: • Interim Build with KEWR focus • UM169 CVS UL when MAINT ALT Set to NONE • National 7110.65 CVS ATC Implementation set for April 3 • Trials will seek EWR/MEM CVS DTAP waiver thru May 15 • EWR ATC FAT Input Planned • Build 7.1 Estimated Schedule: • April 14-15: FAT at Thales • April 16: Install at FAATC • April 17-25: Testing at FAATC • April 28 - May1: Install and SAT at MEM and EWR (Parallel installs)
DTAP Build 7.2 Schedule Update • Build 7.2 Full Climb Via SID Compliance: • Compliance with full 7110.65 CVS Changes • CVS, CVS Except Maintain, Maintain ALT Selections • Longer WJHTC lab testing period expected due to CVS scale • Build 7.2 Estimated Schedule: • June 11-12: B7.2 FAT at Thales • June 13: Install at FAATC • June 16 - July 3: Testing at FAATC • July 7-10: Install and SAT at MEM and EWR (Parallel installs)
KEWR DCL Trials Status Update • UAL, FDX MD11/B777 Daily Ops Ongoing: • Open OPR reports diminishing • UAL FRC DCL Filing Error Reductions • Resuming of UAL B767 ops expected next month+ • UPS Starts Daily MD11/B767 Ops March 15: • Approx. 24 Ops/week expected • AFS-50/400/2P Approval letter to UK CAA pending: • BAW, SAS, DLH CAA Approval letters back to FAA pending • BAW approval expected first
KEWR DCL Trials Status Update • NetJets Trials Participation at KEWR: • NetJets confirmed interest in participating • Kick off Telcon set for March 19 with AOC and Pilot Reps • Bombardier Global Express 5000/6000 aircraft FANS equipped • Bombardier Challenger 350 FANS/VDL2 upgrades expected in July • 1-2 DCL flights/week from KEWR expected • March 1-4 ZNY 72 HR ERAM Testing Complete: • Test was successful • Next 72 HR ERAM run expected April 5-8
KMEM DCL Trials Update • DTAP Running Stable: • Unplanned Recons minimized – 1 event since last DCIT • Server 1, 2 Re-starts On-going (Tues/Fri) • DTAP Processing 20-40 FDX DCL ops per push • Route Revisions remain minimal/none in #s • MEM ATC confirms use of CVS phraseology: - Planned CVS waiver will include MEM