An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Soil RemediationHS-Chem/SmileCorp Collaboration

  2. SmileCorp Smelting Facility • located in Smileyville, NY • zinc, tin and lead production • recycling/recovery of metals • large employer in area • supply metals to many industries

  3. Our Facility • In use for 50 years • 50 acre site • On Smileyville river • recreational • Near residential areas • Near forested areas

  4. Smelting Byproducts • Blast furnace slag • considered harmless • used in other products • off site disposal • Blast furnace stack • dust containing lead • Stored on site • recycling • disposal

  5. Past Practices • Blast furnace slag • may have been dumped in Smileyville river • dispersed around site • left in piles on site • Blast furnace stack • dust may not have been captured • captured dust may be disposed of on site

  6. Subsurface Depth of known lead contamination = 4.5 feet Depth to water table = 5 feet Depth = 10 feet Direction of flow Ground water Bedrock

  7. SmileCorp Options H20 + EDTA? H20 + Pb+2 • Do nothing • Pump and treat • Pump and treat with additive (EDTA) Ground water Bedrock

  8. Lead - ligand Interaction Pb+2 Released into solution Soil Pb+2 Pb+2 Pb+2 In solution “tied up” by ligand Pb+2 EDTA (ethylenediaminetetraacetic acid)

  9. Cost effective solution Least chance of fines from government or lawsuits Non-disruptive procedure SmileCorp Objectives

  10. HS-Chem • Analyze data & run experiments • what will happen to lead on our site if left as is? • should we consider pump and treat technology? • would adding EDTA to the pump and treat system improve results? • what is the best course of action for SmileCorp?