1 / 14

B-Panel Discussion

B-Panel Discussion . Monday 23 rd July 2013. B-Panel Agenda. Review of B-panel ARRA Strategic Plan 2014 – 2016 B-Panel – Forward into 2014 Discussion. B-Panel 2013 Statistics. Number of Referees: 40 Games: - Premier reserve 7 - U21 7* - 85kg 9* - 1 st XV 1A 6*

muniya
Download Presentation

B-Panel Discussion

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. B-Panel Discussion Monday 23rd July 2013

  2. B-PanelAgenda • Review of B-panel • ARRA Strategic Plan 2014 – 2016 • B-Panel – Forward into 2014 • Discussion

  3. B-Panel 2013Statistics Number of Referees: 40 Games: - Premier reserve 7 - U21 7* - 85kg 9* - 1st XV 1A 6* Total 29 (Last year 36) *Shared games Premier, C Panel

  4. B-Panel 2013Statistics 7

  5. ARRA – B-Panel “The most important panel in the ARRA” “The B panel is our future” • Back-up for the Premiers (Reserve referee/AR) • Same games as the Premiers (1stXV 1A, U21) • Feeder into the Premier Panel

  6. B-Panel Vision A team of high-performing referees who aspire for on-field performances worthy of top level club rugby and school games. (Working closely with the Premier Panel)

  7. ARRAStrategic Plan 2014 - 2016 “Transparency, Fairness and Consistency” • Panel criteria • Appointment process • Promotion process • Fluidity between Panels • Academy eligibility

  8. ARRAStrategic Plan 2014 - 2016 “ “Our Match Officials” • Establishing measurable panel criteria • Movement within panel • Performance criteria You will be involved with input for B panel criteria

  9. Most balanced structure! Game Management Law Fitness

  10. B-PanelPerformance Criteria • Fitness (Yo-Yo test/Sprint) • Law (L1 and L2 exam) • Monday meetings (Attendance) • On-field performance (Coaching/Sightings) (Reflect the format and KPIs of the Premier Panel)

  11. Premier PanelFitness Score & Criteria

  12. B-Panel Objectives 2014 • A panel of referees consistently performing at a high level • A group of high potential referees pushing for entry into the Premier Panel and beyond

  13. B-PanelCoaching Programme “Envy of other panels” Coaching = assisting you to develop your own game Structured approach • Individual goals (specifics) • Game plan/work-ons (specifics) • Feedback (sightings) • Development plans Target – 2 sightings for everyone Coaching team – Richard Morris, Ken Worthington, Jeremy Kannemeyer, Other?

  14. B-PanelNext steps - 2014 A team of high-performing referees who aspire for on-field performances worthy of top level club rugby and school games. Individual goals for 2014? Panel criteria – fitness, law, other? Coaching role?

More Related