350 likes | 364 Views
Muon Trigger Upgrade at PHENIX. RIKEN/RBRC Itaru Nakagawa. Summary. Polarized sea quark measurement via W is very Sexy program for RHIC Spin and should take maximum advantage of it However existing PHENIX Muon Arms Cannot Handle High Rates at sqrt(s )=500 GeV Need Trigger Upgrade!
E N D
Muon Trigger Upgrade at PHENIX RIKEN/RBRC Itaru Nakagawa WWND @ Jamaica
Summary • Polarized sea quark measurement via W is very Sexy program for RHIC Spin and should take maximum advantage of it • However existing PHENIX Muon Arms Cannot Handle High Rates at sqrt(s)=500 GeV • Need Trigger Upgrade! • New Triggers have been developed and are under commissioning now We are getting very close to be ready for W production Run!!
s=500 GeV @ RHIC (LO) Parity Violation Asymmetry Clean flavor separation w/o fragmentation uncertainty
Projected Sensitivity @ PHENIX • Full Detector Simulation • S/B ~ 3/1 Assumed • 300 pb-1 and 1300 pb-1
Current Muon System Muon Tracking Chambers 3 stations of Cathode strip chambers Each station has multiple planes for redundancy Slow read out -> No trigger Muon Identifier 5 layers of Iarocci tubes in x and y 80 cm of steel plate absorber (total) Provides trigger p > 2 GeV B MuID MuTr St#1 St#2 St#3 Same configuration in South 5
High Momentum Muon Trigger New Trigger Upgrade Run11 500 GeV Projection σtot=60mb L=1.5x1032cm-2s-1 Rate 9 MHz BBCMuID Rejection Power RP~100 Trigger Upgrade RP ~ 45 90 kHz W RPtot ~ 4500 2 kHz PHENIX Band Width for Muon Required Rejection Power MuID Trigger High Rejection Power High Efficiency
PHENIX Muon Trigger Upgrade • 2 dedicated trigger Resistive Plate Chambers (RPC) stations (CMS design): • ~ 1 degree pitch in j NSF (Funded) • MuTr front end electronics • (MuTr-FEE Trigger) JSPS (Funded) RPC3 RPC1 r=3.40m MuTr
B W Trigger System Trigger events with straight track (e.g. Dstrip <= 1) ~10s Trigger MuTr FEE Interaction Region Rack Room
B W Trigger System Trigger events with straight track (e.g. Dstrip <= 1) MuTRG Data Merge Amp/Discri. Transmit Trigger 5% Optical MuTRG MRG MuTRG ADTX 1.2Gbps Trigger 2 planes MuTr FEE 95% Interaction Region Rack Room
Resistive Plate Counter (RPC) (Φ segmented) B W Trigger System Trigger events with straight track (e.g. Dstrip <= 1) RPC FEE MuTRG Data Merge Amp/Discri. Transmit Trigger 5% Optical MuTRG MRG MuTRG ADTX 1.2Gbps Trigger 2 planes RPC / MuTRG data are also recorded on disk. MuTr FEE 95% Interaction Region Rack Room
Resistive Plate Counter (RPC) (Φ segmented) B W Trigger System Trigger events with straight track (e.g. Dstrip <= 1) Level 1 Trigger Board Trigger RPC FEE MuTRG Data Merge Amp/Discri. Transmit Trigger 5% Optical MuTRG MRG MuTRG ADTX 1.2Gbps Trigger 2 planes RPC / MuTRG data are also recorded on disk. MuTr FEE 95% Interaction Region Rack Room
Resistive Plate Counter (RPC) (Φ segmented) B W Trigger System Trigger events with straight track (e.g. Dstrip <= 1) Level 1 Trigger Board Trigger RPC FEE MuTRG Data Merge Amp/Discri. Transmit Trigger 5% Optical MuTRG MRG MuTRG ADTX 1.2Gbps Trigger 2 planes RPC / MuTRG data are also recorded on disk. MuTr FEE 95% Interaction Region Rack Room
Resistive Plate Counter (RPC) (Φ segmented) B W Trigger System (Final) Trigger events with straight track (e.g. Dstrip <= 1) Level 1 Trigger Board RPC FEE DCM DCM MuTRG Data Merge Amp/Discri. Transmit Trigger 5% Optical MuTRG MRG DCM MuTRG ADTX 1.2Gbps Trigger 2 planes RPC / MuTRG data are also recorded on disk. MuTr FEE 95% Interaction Region Rack Room
Prototype RPC MuTRG MuTRG W Trigger Instrumentationin RHIC 2009 run absorber • Full Installation to North Arm, 1/2 octant installed to South • Demonstrate performance of RPC and MuTRG with beam of s=500 GeV.
New MuTRIG-FEE in North Arm Before Install 2008 Install
MuTrig 0.05Q MuTr Q 0.95Q MIP
B Track Efficiency = (hit efficiency/station ~ 96%)3 x (vertex cut efficiency)
MuTRG System Run09 performance • MuID Algorithm • Track Matching w/ MuID • Timing cut w/ RPC • Track Matching w/ RPC • Background Shields • etc .. 20
RPC RPC1 RPC3 South RPC3 North RPC3 • Fast response • Good intrinsic time resolution • Good spatial resolution: typically ~ cm • Low cost RPC1
RPC Construction People Half octant testing Pre-Assembly Storage NPL: RPC-3 Pre-Assembly
RPC Performance w/ Cosmic Cosmic Ray test with stack of 5 detector modules
Prototype RPC Performance @ Run9 RPC3 RPC2 μ beam BG track reconstructed events Demonstrated Satisfactory Timing Resolution w/ beam! sigma~4.1ns sigma~5.3ns
Prototype RPC MuTRG MuTRG Road Map to Run11 Production Run absorber Run9
MuTRG Road Map to Run11 Production Run RPC3 MuTRG Run10
Installation to South Muon Arm • Post Run9 Shutdown • Completed! • Under Commissioning in Run10 Au-Au Run
MuTRG Road Map to Run11 Production Run RPC3 RPC3 absorber MuTRG Run11
MuTRG Final Muon Trigger Configuration RPC3 RPC3 absorber MuTRG RPC1 Run12
Summary • Seak Quark Polarization Measurement @ PHENIX via W-Boson • High Momentum MuTR-FEE Trigger is Competed Installation and to be Commissioned in Run10 • Both MuTr-FEE Trigger and RPC Commissioning Demonstrated Designed Performances. • More rejection power are expected from • RPC (Timing & Matching) • MuID Algorithm • Background Shields PHENIX Muon Arms are getting ready for pp Production at 500 GeV in Run11
LL1 Trigger Readiness LL1 Board • Communication test • LL1 Boards Production Completed • On going ADTX - MRG - LL1 - GL1 chain test now. • New high momentum trigger will be operated in Run10 for commissioning MuTRG-MRG Boards