1 / 1

Task 1 Assessment of Wind Erosion Potential of Off-road Vehicle Activity

Task 1 Assessment of Wind Erosion Potential of Off-road Vehicle Activity. Task 3a Improved Technologies For Active Fence-line Monitoring of Fugitive Dust Emissions. Task 1a Pre & Post military vehicle traffic site susceptibility survey on undisturbed off-road sites

nadda
Download Presentation

Task 1 Assessment of Wind Erosion Potential of Off-road Vehicle Activity

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Task 1 Assessment of Wind Erosion Potential of Off-road Vehicle Activity Task 3a Improved Technologies For Active Fence-line Monitoring of Fugitive Dust Emissions Task 1a Pre & Post military vehicle traffic site susceptibility survey on undisturbed off-road sites Optical & soil physical properties measurements • Adapt/test WINDPOD for SERDP monitoring • Define system requirements • Full system conceptual design Task 1b Laboratory wind tunnel experiments on samples obtained from Task 1a disturbed and undisturbed sites Task 1c Ongoing soil and vegetation recovery survey of disturbed sites selected from Task 1a Fabricate and bench test a WINDPOD unit DRI/PNNL joint field test exercise Large area, in situ, size segregated measurement of particle deposition dynamics • Field test and calibrate WINDPOD at an existing DRI campaign site using • Aglite (primary calibration standard) • Transmissometer (secondary standard) Task 1d Update WEPS management module and operation database for off-road vehicle traffic EXIT CRITERIA: Working demonstration unit of an eye-safe fence-line monitor SISON Objective Served: 3a EXIT CRITERIA: Updated WEPS model for military vehicle traffic input Wind erosion susceptibility parameters for use in WEPS SISON Objective Served: 1a SISON-10-03 Objectives Served: 1a and 3a

More Related