2014 REGIONAL CONFERENCE DESIGN-BUILD START SOONER... FINISH FASTER. When to Select a Subcontractor in the Design Build Process. Moderator: Ted Laszlo, GH Phipps Panel: Jim Dent, Weifield Electric Tal Clark, US Engineering Brian Patton, JR Butler Eric Moe, Puma Steel. 1. 1.
E N D
2014 REGIONAL CONFERENCE DESIGN-BUILD START SOONER... FINISH FASTER When to Select a Subcontractor in the Design Build Process Moderator: Ted Laszlo, GH Phipps Panel: Jim Dent, Weifield Electric Tal Clark, US Engineering Brian Patton, JR Butler Eric Moe, Puma Steel 1 1 1
2014 REGIONAL CONFERENCE DESIGN-BUILD START SOONER... FINISH FASTER Value Through Early Involvement 2 2 1
2014 REGIONAL CONFERENCE DESIGN-BUILD START SOONER... FINISH FASTER Details of the Design Design/Cost Relationship Range of Design $ Cost (and performance) is fixed Designing to the Budget 3 3 1
Programming 2014 REGIONAL CONFERENCE DESIGN-BUILD START SOONER... FINISH FASTER Design Criteria Design-Build 5% - 20% Preliminary Design Design-Build 20% -35% Direct Sole-Source Selection -10% - 5% Schematic Design Design Development Construction Documents Qualifications Emphasis Technical & Price Emphasis Low Price Emphasis CRITERIA DOCUMENTS Describes End Result BRIDGING DOCUMENTS Prescribes How To Achieve End Result Award Criteria During the Process Design/Draw-Build 35% Design or Greater -10% -5% 0% 5% 10% 15% 20% 25% 30% 35% 40% 45% 50% 55% 60% 65% 70% 75% Pre-Design Design 4 4
2014 REGIONAL CONFERENCE DESIGN-BUILD START SOONER... FINISH FASTER Managing the Process • Key Attributes of a Successful Project • Leadership • Collaboration • TRUST • Key Owner Management Points: • Well defined program requirements • Understanding of contract • Clear direction • Timely decisions • Collaborative atmosphere • Timely Payment 5 5 1