Future development at INCDTIM computing center. Dr. Ing . F ă rca ş Felix. INCDTIM. Achievements in 2011. Grid, MPI and Network. A 10 GBps Uplink Multiple Back up solutions MPI Cluster A functional Grid site processing ATLAS jobs. INCDTIM. Network abilities.
E N D
Future development at INCDTIM computing center Dr. Ing. Fărcaş Felix
INCDTIM Achievements in 2011 Grid, MPI and Network • A 10 GBps Uplink • Multiple Back up solutions • MPI Cluster • A functional Grid site processing ATLAS jobs
INCDTIM Network abilities • Cisco Catalyst 6509E Layer 3 system • ITIM – RoEduNet 10 GB from 1 Mar. 2011 • Nexus system through the Grid system • ~40 GB between WN and SE, Cream • ~20 GB between Site and Switch
NetworkLink INCDTIM Network Link 2009 Farcas F. – CISSE 2009 Farcas F. - AQTR 2008 Network Link 2008 4 Testing the speed with MGEN program, March 2011
Multiple Backup solution INCDTIM U P S Power generator 275kW Uninterruptible Power Source ~ APC Symetra of max 160 KVA full redundant Power Generator 275 KW, start in full 8 seconds 5
INCDTIM MPI Cluster • Program installed • CASTEP (NMR, Forcite, Reflex Plus, Conformers - Moduls) (license) • MolPro, SIESTA, Quantum Expresso, ProChem, Orca, etc • Module Environment Package for job • Monitored by Ganglia • 25 processing station
INCDTIM RO-14-ITIM Grid Site • Four Main station (Cream, Apel, SE, UI) • Max number of processing core 300 • Storage = 100 TB, online 35 (for the moment) • Technology used, next slide…
Technology used INCDTIM HP & IBM web management interface IBM and HP Blade system, total of 46 Blades in only 29 U Intel 1U Sever Processing power: 432core Management -> through web based interfaces MSA Storage capacity: 50 TB, Less space for 46 PC => core increase by 56% Less powerconsume - reduced by 34% Blade system and MSA storage 8
INCDTIM Grid Results 2011 CPU Efficiency ~270.000 jobs (1.01 - 1.11.2011) = 6%(RO) in 2010 ~6000 jobs
Network Configuration and Logical Schema of the Datacenter INCDTIM 10 Farcas F& all – REV 2011
INCDTIM Future development for 2012 • Grid site Development • MPI cluster Development • Improving monitoring in the site and cluster • IPv6 implementation • What are the Financial sources? • RO-LCG 2012 symposium/conference organizing
INCDTIM Grid development • Improving Memory (3 GB/core) • Improving Storagecapacity (online 150 TB) • Building a virtual Grid site based on EMI (European Middleware Initiative) for testing • If the testing are successful implementing the Grid site with EMI • Implementing IPv6 in the virtual site
INCDTIM http://grid.itim-cj.ro
INCDTIM MPI development • Building a strong monitoring system (nagios, ganglia) • Implementing special queues for special processing program • Installing new software (Gaussian 2009, CRYSTAL & WIEN2k) • Acquiring 80 processor for MPI processing, technology unknown !yet!
INCDTIM Financial Resources • Fund through National Authority for Science Research (NASR) • Continuing the 12 EU – ConDeGrid / 2009 - 2014 • Continuing the 15 EU / 2009-2014 • Cooperation program "Hulubei-Meshcheryakov“ together with the Laboratory of Information Technologies at JINR –Dubna 2010-2013 • POS-CCE 192, Improving the capacity and reliability of INCDTIM GRID center for integration in international networks (INGRID) • POS-CCE 536, Axis 2, operation 2.1.2 • PN-II-RU-TE-2011-3-0124 • PN-II-RU-TE-2011-3-0085: „Modelarea First-Principles a Oxizilor bazati pe SrTiO3 pentru Aplicatii Termoelectrice”. • PN-II-KAI2.2- O2.2.1-2PM/2008Molecular and Biomolecular Physics Department Upgrading – MDFMOLBIO
INCDTIM UNIUNEA EUROPEANA GUVERNUL ROMÂNIEI POS-CCE 192 Improving the capacity and reliability of INCDTIM GRID center for integration in international networks (INGRID)
Project 192 contract no: 42/11.05.2009 INCDTIM • Main acquisitions • Power generator ( ~21.250 Euro) • HP Blade system ( ~193.000 Euro) • Cisco Catalyst 6509E system ( ~141.000 Euro) • APC UPS system ( ~95.000 Euro) Total value: 2.345.800 lei ~ 500.000 Euro 11.05.2009 to 10.03.2011
INCDTIM http://www.itim-cj.ro/PNCDI/ingrid
INCDTIM http://www.itim-cj.ro/mdfmolbio
INCDTIM Research area applied for MPI resources • Molecular and biomolecular physics • Numerical Modeling • Molecular and Biomolecular Modeling • Structural Analysis on Solids
INCDTIM 2012 RO-LCG meeting • We are organizing the RO-LCG meeting next year in Cluj-Napoca at INCDTIM • We are doing it with the support of IEEE Romania • We will publish your contribution in an IEEE volume • We are waiting for interesting reports and contribution in LCG and Parallel computing domain.
INCDTIM Published articles 2011 • F. Farcas, R. Trusca, S. Albert, Izabella Szabo & G. Popeneciu, Application of Green IT for Physics Data Processing at INCDTIM, PIM 2011 • Trusca MRC, Farcas F, Szabo I, Albert S, Floare C.G., Techniques for parameters monitoring in datacenter, XXIII International Symposium on Nuclear Electronuics & Computing, NEC 2011, Varna 2011 • Felix Farcas, Development of INCDTIM Datacenter using „green IT”, XXIII International Symposium on Nuclear Electronuics & Computing, NEC 2011, Book of Abstract, plenary session. • Felix Farcas, Radu Trusca, Grid computing Improvment at INCDTIM Cluj, Proceedins REV-2011, Remote Engineering and Virtual Instrumentation, International Association of Online Engineering, ISBN 978-3-89958-55-1.