110 likes | 266 Views
China MM-Wave (CMMW) Study Group July 2012 Closing Report. Date: 2012-07-20. Authors:. Abstract. This document is the closing report for CMMW SG for the July 2012 session. . Work Completed. CMMW PAR and 5C SG/WG approved response to comments: 12/0937r3
E N D
China MM-Wave (CMMW) Study Group July 2012 Closing Report Date:2012-07-20 Authors: Eldad Perahia, Xiaoming Peng
Abstract This document is the closing report for CMMW SG for the July 2012 session. Eldad Perahia, Xiaoming Peng
Work Completed • CMMW PAR and 5C • SG/WG approved response to comments: 12/0937r3 • SG/WG approved PAR: 12/0140r9 (word), 12/0948r0 (pdf) • SG/WG approved 5C: 12/0141r7 • Task Group Logistics • SG approved task group logistics: 12/0827r2 • IEEE 802.11aj September Meeting Logistics: 12/958r0 • 2012-2014 CMMW TG interim meeting dates & locations: 12/0635r0 • Study Group Extension • SG approved extension rationale: 12/0886r3, slide 25 • SG approved extension Eldad Perahia, Xiaoming Peng
IEEE 802.11aj Sept Meeting Logistics • Meeting: IEEE 802 Interim Meeting (The 1st 802.11aj TG meeting) • Meeting Date: Sept 26-27, 2012 • Meeting Venue: Beijing China • Meeting Registration fee: US$250 • Other logistics: Two tea break, lunch, Wi-Fi access • Meeting Hotel: Hotel Nikko New Century Beijing • http://www.newcenturyhotel.com.cn/ • Hotel expense: <US$160/day • Hotel Reservation info will be put in the IEEE 802 website once CESI confirms with the hotel • Reservation can be done online w/o giving credit card information • The payment of hotel and registration fee will be deduced upon your check in at hotel • Event: Forum of Chinese Milli-meter Wave 2012 • Jointly organized by CESI & IEEE 802 (pending confirmation) • Event date: Sept 25, 2012 Eldad Perahia, Xiaoming Peng
Goals/Agenda for September • Complete Study Group (if necessary) • Start Task Group • New member orientation • Review Task Group logistics • TG officer elections • Chair, Vice-Chair, Secretary • Presentations on CMMW Eldad Perahia, Xiaoming Peng
Rationale for Study Group Extension • 802.11 CMMW SG and 802.11 WG have approved the CMMW PAR and 5 Criteria • Requesting study group extension in case extra time is necessary to respond to comments from 802 EC and NesCom Eldad Perahia, Xiaoming Peng
Conference call times • Thursdays 19:00-20:00 ET • Aug 23, 30 Eldad Perahia, Xiaoming Peng
Motion on Task Group Logistics Document Move to approve CMMW Task Group logistics contained in document 12/0827r2 Moved by Xiaoming Peng on behalf of CMMW SG [CMMW SG vote: Moved: Haiming Wang, Seconded: Edward Au, Result:10-0-1] Eldad Perahia, Xiaoming Peng
Motion for September Meeting Logistics and Agenda Move to approve meeting logistics and agenda (in 12/0887r0, slides 4 & 5) for September CMMW Interim in Beijing Moved by Xiaoming Peng Eldad Perahia, Xiaoming Peng
Motion to Extend a Study Group Request the IEEE 802 LMSC to extend the 802.11 CMMW Study Group. Moved by Xiaoming Peng on behalf of CMMW SG [CMMW SG vote: Moved: Haiming Wang, Seconded: Edward Au, Result: 14-0-0] Eldad Perahia, Xiaoming Peng
Motion on Rationale for Study Group Extension • Move to approve “Rationale for Study Group Extension” on slide 25 of 12/886r3 • Moved by Xiaoming Peng on behalf of CMMW SG • [CMMW SG vote: • Moved: Edward Au, Seconded: Haiming Wang, Result: 14-0-0] Eldad Perahia, Xiaoming Peng