100 likes | 117 Views
Pogled Telecommunications specializes in designing and implementing computer networks based on specific requirements and project tasks. With extensive experience in Cat.5e standards, the process involves detailed planning, testing, and choosing the best transmission medium for optimum performance. From premises marking to Layer 3 design, every step ensures a reliable and efficient network solution. Contact us for expert network services.
E N D
Designing and implementation of computer network • Pogled Telecommunications d.o.o is engaged in designing and implementation of computer networks • The process is based on the requests and project task(facility structure, number of operation units, expansions expected in the period of several years) • A long year experience mostly refers to 5e (Cat 5e) standard • At the very end of works, necessary tests are done in order to check whether all the tasks have been done successfully
Project completing-general access to solution • In the process of project development, drafts and calculations for passive and active computer networks are made • If the campus structure is such, the number of inter distribution frames (IDFs) has to be defined • By careful analysis of the facility structure, the best solution is chosen (e.g. the space above the lowered ceilings can be used for cable hooking) • The last step is to choose a type of transmission medium
Transmission medium types 1 • Criteria: • Length • Bandwidth (expansion is expected) • Resistance to interference (interbuilding) • Price • Simplicity of implementation and maintenance • Choice is narrowed to UTP Cat 5e and6, Multi and Single Mode optical cables
Transmission medium Type 2 • One of the tasks is premises marking, wall jacks and fields on patch panels • This access facilitates the process of designing and further maintenance • In accordance with the chosen solution, calculations for passive computer network(racks , connection modules, patch panels, total number of jacks)and table display of total quantuty of the same(so called Cut Sheet)are done
Layer 2 i Layer 3 - Design 1 • LAN infrastructure is mainly based on LAN Switches • Switches are installed in this way: • POPs – access level – 100BaseTX UTP cables • IDFs – distributive level – 1000BaseTX STP cables, POP-IDF connection • MDF core level 1000BaseLX, optical IDF-MDF connections • On basis of port density a corresponding layer 2 solution has to be chosen
Layer 2 and Layer 3 - Design 2 • After successful implementation of layer 2 solution, the equipment for layer 3 is chosen • Also,if a project request is such, it is necessary to define layer 3 addressesfor the end user stations • Thereby, the way of out-routing should be taken into consideration(depending on routing protocol, it is necessary to choose a hierarchical mode of addressing which will enable summarization of addresses)
Implementation process • After successful project design, the process of implementation is being done • Pogled Telecommunications d.o.o. employs the expert staff capable to successfully accomplish such a complex task • At the end, by means of corresponding equipment detailed tests are done so as to check the quality of works done
POGLED TELEKOMUNIKACIJE DOO Vojvode Mišića 58/2, Niš tel/fax: 018 4510 920 e-mail: rac.mreze@pogledtel.rs www.pogledtel.rs