Tasks, Milestones and Manpower March 4, 2005. Optimize kinematics, rates, conditions? run plan (Lingyan and Xiaodong) Simulations: background, physics, PID, detectors (Xin, Huan, Lingyan and Xiaodong) HRS (Lingyan): Kaon detection (Franco) A1/A2 (Lingyan)
E N D
Tasks, Milestones and ManpowerMarch 4, 2005 • Optimize kinematics, rates, conditions? run plan (Lingyan and Xiaodong) • Simulations: background, physics, PID, detectors (Xin, Huan, Lingyan and Xiaodong) • HRS (Lingyan): Kaon detection(Franco) A1/A2 (Lingyan) • BigBite (beyond Gen) (Doug, Nilanga?) Supporting Structure(Doug) Background test(Lingyan) new Cherenkov? (Brad) Other detectors?(Nilanga?) • Trigger and DAQ(?), Analysis software(Xiaodong) • Luminosity Monitoring (Xiaodong)
Transversity Tasks (II) • Polarized 3He target (Todd, JP) Polarization reversal adiabatic RF flip (Huan) laser polarization reversal (Lingyan) Vertical coils (Al, J.C.) Target ladder-oven system (Al, Todd, JP) Cells (Gordon, Todd) Optical lines (JP, ?) NMR (Huan, Todd) EPR (Xin, Wolfgang?) Field measurement (Wolfgang?)
Possible Milestones • Pol. 3He Polarization Flip: 12/05 Vertical Coil: design 8/05, construction 12/05 Oven-ladder: design 12/05, construction/testing 3/06 Cells: start production 12/05, 15 cells 8/06 Optics: design 10/05, test 3/06 NMR/EPR: test 6/06 Field Measurement: 3/06 • BigBite Cherenkov: design/construction 3/06, test 6/06 Support structure: will be ready for Gen • HRS RICH: upgrade 12/05 • Trigger/DAQ/Analysis Software: 8/06 • Ready for experiment: 10/06