1 / 1

Collaboration Metrics 60% final product design done by suppliers Aberdeen June 2002

Engineering Collaboration Scenarios Distributed Design Collaboration Outsourced Design Activities Design Reviews Change Investigation. Collaboration Scenarios and Groups. Manufacturing Collaboration Scenarios Outsourced Manufacturing Manufacturing Reviews. Customer Collaboration Scenarios

nasya
Download Presentation

Collaboration Metrics 60% final product design done by suppliers Aberdeen June 2002

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Engineering Collaboration Scenarios • Distributed Design Collaboration • Outsourced Design Activities • Design Reviews • Change Investigation • Collaboration Scenarios and Groups Manufacturing Collaboration Scenarios • Outsourced Manufacturing • Manufacturing Reviews Customer Collaboration Scenarios • Customer Collaboration • Proposal Response • Effective Collaboration Criteria • Simple • Web-based • Easy access for internal and external team members • Self-service administration • Visualization capabilities • Personal subscription enables notification of updates to relevant information. • Powerful • Facilitates collaboration globally • Role-based access control to specific information • Synchronous and asynchronous collaboration • Connected • Supports a wide variety of MCAD,ECAD data formats and other document types • Collaboration Metrics • 60% final product design done by suppliersAberdeen June 2002 • 40% reduction in product development cycle timeGiga Information Group • Eliminate 70% of physical prototypes and 30% reduction in data proliferationPTC study • Travel down 50% to 80%Document production and shipping down 90%Manufacturing errors down as much as 50%Giga Information Group • Collaboration Impact Areas • Reduced Time to Market • Lower Lifecycle and Overhead Costs • Lower Product Development Costs • Accelerate Information Exchange • Optimize Quality • Drive Innovation

More Related