1 / 20

January 30, 2013 – Holyoke ma

January 30, 2013 – Holyoke ma. Doug Smith. Manager of demand resource administration. Summer 2012 Final Results for All DR December 2012 Initial Results for Passive DR. DR Performance Update. Presentation Note – Gross-up for T&D.

natan
Download Presentation

January 30, 2013 – Holyoke ma

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. January 30, 2013 – Holyoke ma Doug Smith Manager of demand resource administration Summer 2012 Final Results for All DR December 2012 Initial Results for Passive DR DR Performance Update

  2. Presentation Note – Gross-up for T&D • All performance is reported without gross-up for T&D Losses (8% during CP3) • For comparability, All CSO is reported as Net CSO, which is a non-grossed up value, typically CSO/1.08 • This results in an ‘apples to apples’ comparison between performance and CSO, with one caveat: • Resources which have multi-year commitments may get higher gross-up values • This may result in net CSO being slightly over-reported in this presentation and the associated performance being slightly under-reported in some cases • Because of this caveat, the performance included in this presentation should be considered a conservative approximation.

  3. Active Resources Summer 2012 Audit Results for RTDR and RTEG

  4. Audit Results by Resource Type Summer 2012

  5. RTDR and RTEG Audit Results Summer 2012

  6. Summer 2012 RTDR and RTEG Audit Results Capped at Load Zone Net CSO

  7. Summer 2012 RTDR and RTEG Audit Results Capped at Resource Net CSO

  8. Range of PerformanceSummer 2012 Audit of RTDR & RTEG Resources

  9. RTDR Audit Results Summer 2012

  10. Summer 2012 RTDR Audit Results Capped at Load Zone Net CSO

  11. Summer 2012 RTDR Audit Results Capped at Resource Net CSO

  12. Range of PerformanceSummer 2012 Audit of RTDR Resources

  13. RTEG Audit Results Summer 2012

  14. Summer 2012 RTEG Audit Results Capped at Load Zone Net CSO

  15. Summer 2012 RTEG Audit Results Capped at Resource Net CSO

  16. Range of PerformanceSummer 2012 Audit of RTEG Resources

  17. Passive Resources Average Performance for Months (June-Aug 2012 Final) and Initial December 2012 Performance for On-Peak and Seasonal Peak Resources

  18. Total Passive Performance & CSO Summer and Winter 2012 by Load Zone

  19. Passive Resources Historical Performance by Load Zone Passive Distributed Generation Resources contributed 8% to the total monthly performance

More Related