250 likes | 393 Views
Quad-Roundabout Double-Diamond Interchange. ITS World Congress 2011 Joel K. Marcuson, PE Ulteig Engineering Fargo, ND, USA. Background. Concept Developed for Design/Build I-494/TH 169 Project Minneapolis, MN, USA . 3 Traffic Signals Create 3mile Backup Every Morning on TH 169
E N D
Quad-RoundaboutDouble-Diamond Interchange ITS World Congress 2011 Joel K. Marcuson, PE Ulteig Engineering Fargo, ND, USA
Background Concept Developed for Design/Build I-494/TH 169 Project Minneapolis, MN, USA
3 Traffic Signals Create 3mile Backup Every Morning on TH 169 Only Signals on TH 169 Corridor Project Need
Remove 3 Signals and Old-Fashioned Cloverleaf/Signalized Intersection Design Replace with Direct Interchange, Bridges/Roundabouts – Local Traffic 6 Roundabouts = MOT Opportunity Project Description
Keep Through Traffic on I-494 and TH169 Moving Maintain Access to Local Traffic Around and Through Project MOT Objective
Remove Signals Quickly Build Bridges Quickly Run Turning/Local Traffic on Roundabout System MOT Approach
Using Permanent Features (Roundabouts) for New Purpose Accommodates all Traffic and Movements Innovation
Full Access, Improved Traffic Early TH 169 Free Flow I-494 Bottleneck Removed Avg Speeds Doubled Unconstrained Flow – During Construction Benefits of Innovation
Current Need - > Service < System Interchange Quad-Roundabout DD Interchange Fills That Need Results of Innovation
Flooding – Closed All Nearby Crossings Except TH 169 Volumes Increased on TH 169 Restripe 169, Remove Signals Nature Interfered
$5B Deficit Government Shutdown Contractor Stopped Politics Interfered
Contractor Lost Time, Twice Lost Money, Twice New Approach – Build Final Quickly Quad Roundabout DD Abandoned Result
One of Best Designs Never Implemented An Approach That Will Work For Right Occasion/ Right Time Quad-Roundabout DD Interchange
Are Everything Still Want to Share Idea Could be Groundbreaking Timing/Circumstances
Between Service and System High-Performance Service Interchange Significant Cost Savings Signficant Benefits New Category Needed
System Costs = $250-500M High-Performance = $25-50M Similar Results, 10% of Cost $$ Impacts Important
Couldn’t Make it “Not” Work Doubled Traffic – No AppreciableChange in Performance What We Discovered