40 likes | 208 Views
The prefab buildings at Barrow 09. “yellow tape”. BARC. DOAS View direction. Prevailing wind. Balloon. Tower 1. Exhaust Line and blower. 25m. Tower 2. Pristine snow field. Tower 1 should be 10 feet away from PB1, roughly to the N.
E N D
The prefab buildings at Barrow 09 “yellow tape” BARC DOAS View direction Prevailing wind Balloon Tower 1 Exhaust Line and blower 25m Tower 2 Pristine snow field Tower 1 should be 10 feet away from PB1, roughly to the N. Tower 2 should be 25m away from PB2, perpendicular to the main NE wind direction.
BARC room # ???? Additional lab space needed for GC and sampler UCSD Freezer LGGE Snow Chemistry work space DOOR UCSD table space Total Power for Lab: About 2,000W of 110V/60Hz About 2,000W of 240V/50Hz UCD UV/Vis + work space MDK-UK-RHUL UV-Vis workspace and battery charging area
BARC BUILDING Room 135 Max-DOAS DOAS needs wall port / window NCAR HTDMA NCAR/UToronto VTDMA, NCAR Particle Counters NCAR Particle Sizer 2700W 110V60Hz 1500W 240V60Hz
THE TENT LGGE cold lab work space LGGE 14’ diameter octagonal tent / wind shelter No power for experiments needed but if possible, ~80W of power desired for lights Grannas POPs NCAR flux samplers (outside on the snow) flux tower Total Power for outside activities: About 600W of 110V/60Hz, 1,800W at startup for Grannas POPs, 500W of power for flux tower bypass pump