1 / 4

[Jeff Hawkins, Joe Turk, Kim Richardson, Rich Bankert, Christian Mitrescu] 1

The Near Real-Time and Science Study Satellite Product Suite for the Tropical Cyclone Structure (TCS-08) Field Project. [Jeff Hawkins, Joe Turk, Kim Richardson, Rich Bankert, Christian Mitrescu] 1 [Chris Velden, Derrick Herndon, Tony Wimmers, Tim Olander] 2 Steve Miller 3 , John Kent 4

nathan
Download Presentation

[Jeff Hawkins, Joe Turk, Kim Richardson, Rich Bankert, Christian Mitrescu] 1

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The Near Real-Time and Science Study Satellite Product Suite for the Tropical Cyclone Structure (TCS-08) Field Project [Jeff Hawkins, Joe Turk, Kim Richardson, Rich Bankert, Christian Mitrescu]1 [Chris Velden, Derrick Herndon, Tony Wimmers, Tim Olander]2 Steve Miller3, John Kent4 1Naval Research Laboratory Monterey, CA 93943 1Cooperative Institute for Meteorological Satellite Studies (CIMSS) University of Wisconsin, Madison, WI 53706 3Cooperative Institute for Research of the Atmosphere (CIRA) Colorado State University, Ft. Collins, CO 80523 4Science Applications International Corporation Monterey, CA 93940 P-17

  2. Tropical Cyclone Structure - 08 NRL TCS-08 Web Page: http://www.nrlmry.navy.mil/TCS.html Scatterometer & CloudSat Vis/IR imagery suite Storm Basins & Names Microwave imager/sounder product suite Latest 1-km Visible/IR imagery (GEO/LEO) 30 minute MTSAT refresh with AVHRR/OLS as available Automated Tropical Cyclone Forecasting (ATCF) System warning graphic

  3. Tropical Cyclone Structure - 08 Real-time aircraft flight track planning and adjustments via Google Earth

  4. Tropical Cyclone Structure - 08 Tropical Storm Genesis Stage Height Aug 15/1916Z Aug 17/2008Z Nuri location Weak Typhoon Strong Typhoon Height Aug 19/0832Z Aug 19/2100Z Height-Longitude X-Sections of AMSU Temp Anomaly through Storm

More Related