1 / 16

Evaluation Plan for Geotargeted Efficiency Programs November 19, 2008

Evaluation Plan for Geotargeted Efficiency Programs November 19, 2008. Purpose of this presentation. Describe draft plan EVT/DPS collaboration (as requested) Gather feedback from this group Reality Check Ideas for improvement. Evaluation Purpose. Proof of concept

Download Presentation

Evaluation Plan for Geotargeted Efficiency Programs November 19, 2008

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Evaluation Plan for Geotargeted Efficiency Programs November 19, 2008

  2. Purpose of this presentation • Describe draft plan • EVT/DPS collaboration (as requested) • Gather feedback from this group • Reality Check • Ideas for improvement

  3. Evaluation Purpose • Proof of concept • What level of savings can targeted EE deliver? • How fast? How much does it cost? • Are savings delivered to constrained circuits? • How? • Through Process Evaluation • Verification of Savings Claims • Correlation of savings to the constraint in question

  4. Not the Purpose! • The Evaluation will NOT determine if a particular transmission or distribution investment has been deferred or avoided • (but results can help!)

  5. DPS getting help (Phew!) • Plan to hire a contractor • EEU Evaluation Budget • Contractor to help develop selected areas of evaluation • Kick off meeting where work plan is discussed

  6. Evaluation Boundaries • Four Original Geotargeted Areas • Southern Loop • North Chittenden • St. Albans • Newport/Derby • 18 months of program activity • June/July 2007 – December 2008 • Leverage DPS ongoing evaluations

  7. Five-piece evaluation framework • Target area selection, collaboration efforts • Program implementation • Savings verification • Correlation of savings results at constraint • Long term evaluation

  8. Target Selection Process Eval • Goal: Increase confidence that selected areas have undergone robust review • Review and make recommendations as to • Broad process including all parties • Development of Target area proposals • DPS Contractor/Surveys/Spring 2009

  9. Target Selection Process Eval • How were the original target areas chosen? • How did information barriers and time constraints affect the choices made? • What are perspectives of key parties regarding process & communication?

  10. Implementation Process Eval • Goal: Reflection to help inform decisions • Program design and implementation process • How overall budgets are best utilized • DPS Contractor/Surveys/Spring 2009 • Surveys of EVT/Customers & Trade Allies/etc.

  11. Implementation Process Eval • What were lessons learned? • How were contract goals set and did they affect program design? • Are there opportunities to improve effectiveness? • How did GT focus affect statewide delivery of efficiency resources? • Were lost opportunities created?

  12. Savings Verification • Goal: Verify EVT GT Savings in each targeted area • Current DPS Contractor June/July 2009 • Researchable questions include: • How do GT area savings compare w/ non-GT? • MWh and MW savings, cost/kWh, TRB, etc. • Are GT interventions a ‘no regrets’ strategy?

  13. System Impact Evaluation • Goal: Determine EE savings correlation to particular circuit • DPS Contractor - Analysis of Utility & Verification data • What is available? • July - October 2009

  14. System Impact Evaluation • What are trends shown by substation data analysis? • Before/during/after implementation of GT services? • Compared to forecasted load growth? • Is it possible to detect GT impacts at substation level? • Were there other influences that significantly affected circuits positively or negatively?

  15. Long-term evaluation questions • Not necessarily answered in the next year or by this process • What is correlation between savings at ISO peaks vs. local/VELCO peaks? • How do we verify current T&D capacity assumptions and track any deferral decisions? • What additional information is necessary to help assess effectiveness of GT programs? • Others?

  16. The End Thoughts/Ideas/Questions? THANK YOU! TJ Poor Department of Public Service 802-828-0544 Walter.poor@state.vt.us

More Related