An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. California’s Central ValleyFlood System Improvement Framework California Levees Roundtable March 27, 2009

  2. Agenda 2 Origins of the Roundtable Central Valley Flood System Improvement Framework Short Term Plan Long Term Approach Outstanding Issues Ahead Discussion

  3. Origins of the CA Levees Roundtable Corps’ Draft “White Paper” July Levee Conference August Vegetation Symposium CA Levees Roundtable

  4. Why Was the Roundtable Established? • Recognition of high risk to public safety due to levee erosion, encroachments, seepage, channel capacity & vegetation management • Draft Corps “White Paper” on the “Treatment of Vegetation Within Local Flood Damage Reduction Systems” • Issued by the US Army Corps of Engineers in April 2007 • Triggered by devastation of New Orleans by Hurricane Katrina in 2005 • Enforcement of existing levee maintenance standard • National standard poses major challenges for the Central Valley Flood Management System • NEEDED COLLABORATIVE SOLUTION

  5. California Levees Roundtable Goals • Establish a dialog among the leadership of levee maintaining agencies and resources agencies regarding maintenance on California’s Central Valley levees. • Develop collaborative relationships among the stakeholders to work toward policy solutions regarding maintenance of California’s Central Valley levees. • Achieve consensus on broad policy guidance on California levee vegetation standards that protect public safety and critical habitat. • Gain agreement on a process and next steps toward establishing and implementing sustainable California levee maintenance standards, while conserving or enhancing existing habitat for fish and wildlife species.

  6. Roundtable Agreements • Public safety is the top priority • Vegetation management is only one of many issues that threaten levee integrity • Draft a phased system-wide plan to address highest risks to levee stability and public safety first (the Framework) • Includes short- and long-term elements • Levee maintaining agencies should defer any substantial vegetation removal along levees while the plan is being developed • Any vegetation removal to comply with applicable State and Federal laws • There is an urgent need to reduce risk throughout the Central Valley by applying a system-wide remedy to levee threats

  7. The Framework • Short-term Framework for flood system improvements that are already underway or will be initiated before a comprehensive plan (CVFPP) is ready in 2012 • Geographic scope of Framework same as CVFPP • Activities outlined in the Framework are focused on addressing five threats to improve public safety • Channel Capacity • Seepage • Erosion • Encroachments • Vegetation • No single threat given priority in the short-term

  8. Important Elements of the Short-term Framework • Inspections • Enforcements • Maintenance • Early Implementation Projects • Emergency Response • Public Outreach • Data Collection • Project Planning • Feasibility Studies • Ongoing Flood Protection Projects • Research • Environmental Considerations • Coordination • Issues to Resolve • Implementation Roles

  9. Interim Levee Vegetation Inspection Criteria • Criteria apply on: • Entire landside slope plus a 10-feet wide easement beyond the landside toe. • Top 20 feet (slope length) of waterside levee slope. • Trees trimmed to five feet above the ground (12 foot clearance above the crown road) and thinned enough for visibility and access • Brush, weeds, or other such vegetation over 12 inches high blocking visibility should be trimmed, thinned, mowed, burned, dragged, or otherwise removed in an allowed manner.

  10. Interim Levee Vegetation Inspection Criteria

  11. Interim Levee Vegetation Inspection Criteria

  12. Rated Items: Grass/BrushUnacceptable

  13. Rated Items: Grass/BrushMinimally Acceptable

  14. Rated Items: Grass/BrushAcceptable

  15. Rated Items: TreesUnacceptable

  16. Rated Items: TreesMinimally Acceptable

  17. Rated Items: TreesAcceptable

  18. LMA Maintenance Rating: 2007/2008 Comparison

  19. Maintenance Deficiencies: Percentage of System Levee Miles

  20. Maintenance Deficiencies: Percentage of System Levee Miles

  21. Important Milestones of Framework • LMAs to maintain levee vegetation according to the DWR’s Interim Levee Inspection Criteria for Vegetation • Levees in the Central Valley to be in compliance with the interim vegetation requirements by November 1, 2010 • Report by LMAs of compliance with interim vegetation standards by November 1, 2009

  22. Much Has Already Been Accomplished • Significant progress made in 2008! • Implementation of Interim Inspection Criteria • System wide investigations proceeding • Portions of the system meet Corps standards • Agreement to measure progress toward remaining Framework goals annually • Corps and DWR • Flood System to remain “active” in PL 84-99 • Eligibility reviewed annually • Eligibility reconsidered in 2012 • Corps HQ letter, January 9, 2009 • Sets requirements for extension of PL84-99 eligibility

  23. Long-term Approach • Conserve and enhance riparian habitat on the waterside of levees • Aggressively pursue compliance with Corps levee standards including vegetation using: • Improved maintenance inspections • Phased vegetation management practices • Regional variances • Engineered alternatives

  24. Long-Term Approach (continued) • Fully integrate the short-term activities with California FloodSAFE initiative • System-wide Central Valley Flood Protection Plan (CVFPP) • Development underway with implementation scheduled to begin in 2012 • Develop Multi Species and Floodplain Conservation Strategy • Conduct research on effects of vegetation and vegetation management on levee integrity/performance

  25. Continued Collaboration and Next Steps • Roundtable participants are committed to broad based stakeholder collaboration • Many specifics of the Framework will be resolved during the next four years as implementation progresses • Levee integrity concerns will be addressed collaboratively by federal, State, and local agencies during the development and implementation of the Central Valley Flood Protection Plan and the California FloodSAFE initiative

  26. Outstanding Issues Ahead • Define standardized maintenance processes and responsibilities of LMAs • Address authorized and unauthorized encroachments • Processes for identification and enforcement • Develop stable funding mechanisms at federal, state and local levels • Assist LMAs achieve stable and sustainable funding • Work with FEMA on levee certification issues • Complete research initiatives

  27. Outstanding Issues Ahead (continued) Identify applicable environmental law requirements relating to short and long-term actions Develop CA vision addressing environmental protection and public safety concurrently Define opportunities for LMAs to cost effectively mitigate impacts of levee maintenance Develop programmatic approaches for environmental compliance Define ESA consultation or permitting alternatives

  28. For More Information • Framework available at • http://www.cvfpb.ca.gov/ • Participant Agencies Contact Persons: CORPS Paige Caldwell (916) 557-6903 FWS Michael Hoover (916) 414-6704 NMFS Howard Brown (916) 930-3608 FEMA Kathleen Schaefer (510) 627-7129 DWR Gary Hester (916) 653-6870 CVFPB Jay Punia (916) 574-0609 DFG Scott Flint (916) 653-9719 SAFCA Peter Buck (916) 874-4581 RD 2068 Mike Hardesty (707) 678-5412

  29. Staff Recommendation • Staff recommends that the Board approve “California’s Central Valley Flood System Improvement Framework” developed by the California Levees Roundtable. • Staff recommends that the Board direct its Executive Officer in collaboration with the Department of Water Resources to submit the Framework Document on behalf of the State, to the U.S. Army Corps of Engineers demonstrating, the many ongoing and planned system-wide improvements and seek temporary extension of PL 84-99 eligibility based on the U.S Army Corps of Engineer’s Director of Civil Works January 9, 2009 memorandum.

  30. Questions?