Future Facility

The House of Mercy is facing overcapacity issues and needs a new facility or expansion to better serve their guests. The Future Facility Team is tasked with planning and logistics to solve this problem.

nbradford
Download Presentation

Future Facility

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Future Facility Kevin Gebo Billy Swift RusbelFeliz Angel Segura

  2. Problem • The House of Mercy is overcapacity and having a difficult time adequately and safely satisfying the needs of the guests. The House of Mercy needs to either move to a larger location or expand the existing location in order to meet the needs of the current guests. Unfortunately, the House of Mercy lacks support from the city, making a complete relocation to a nearby location infeasible.

  3. Challenge Statement • The Future Facility Team has been tasked with assisting the House of Mercy with the planning and logistics related to solving the current building overcapacity issue. http://i231.photobucket.com/albums/ee220/mkorfhage/crowded.jpg

  4. The Goal • The team’s goal has been to plan the layout of a new facility and suggest improvements to the existing facility that will help alleviate space issues and will allow the House of Mercy to better serve their guests. http://blog.liverpoolmuseums.org.uk/graphics/community_consultation_cafe.jpg

  5. Customer Needs • Security • Control of guests • Efficient processing of information and goods • Homelike atmosphere • Empowerment of guests • Comfortable working and living conditions for staff and guests • All desired facilities are available (community space, sleeping quarters, offices, etc.)

  6. Plans for the New • A new facility (St. Bridget’s) was evaluated • 3 layouts were produced and analyzed • A final new facility layout was developed

  7. Prototypes Option 1 Option 2 Option 3 • Developed 3 basic layouts that were a mix of ideas from the class and services that Sister Grace wants to offer

  8. Pugh Analysis

  9. Final Layout

  10. Plans for the Old • Due to the loss of the bid on St. Bridget’s, improvements to the existing House of Mercy have been developed

  11. Improvements to existing HoM • The house next door could be purchased and renovated • Provide office space and living quarters for staff

  12. Improvements to existing HoM • Upstairs (Rita’s living quarters) could be utilized by guests • Living quarters for women • Sunday service area

  13. Improvements to existing HoM • Renovate current garage • Build a connecting addition from the house to the garage- useful for intake, and office space • Lower level used for office space- upper level used for storage

  14. Improvements to existing HoM • Knock the garage down • Build a 2 story addition off of offices (sleeping quarters/bathrooms) • Parking lot and donation pickup/drop-off location behind new addition

  15. Improvements to existing HoM • Knock the garage down • Build a 2 story addition off of offices (sleeping quarters/bathrooms) • Parking lot and donation pickup/drop-off location behind new addition

  16. Improvements to existing HoM • Better utilization of space within the current house • Many empty pockets inside house • Entrance breezeway (check-in)

  17. Improvements to existing HoM • Better utilization of space within the current house • Many empty pockets inside house • Hallways

  18. Improvements to existing HoM • Better utilization of space within the current house • Small room by the main entrance • Use for security equipment

  19. Improvements to existing HoM • Better utilization of space within the current house • Conference room • Community space

  20. Improvements to existing HoM • Existing community space could be utilized better (after separate sleeping quarters are installed). • Remove half of couches and put in chairs and tables

  21. Questions?