An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Parking Lot Connectivity Prepared for the City of Shelby By Isothermal Planning and Development Commission

  2. Illustration Lot A and Lot B are both undeveloped

  3. Lot A developed Commercial Building(s) Owner of Lot A develops lot into a commercial plaza Owner of lot A also is required to build half cross access on property Owner of lot A has typical driveway access to Main road

  4. Lot B developed Commercial Building(s) Commercial Building(s) Owner of lot B is required to build the second half of cross access on property

  5. Works for Bicycles/Pedestrians Lot A and Lot B create an interconnected network for pedestrians/bicyclists

  6. Talking Points • Reducing the number of places pedestrians and cars meet improves overall safety • Additional “Cut Thru’s” reduces the traffic on the main arterial road and improves traffic flow • Incentive based options can help other development issues: • Storm water runoff • High cost of parking lot maintenance • More walkable community

  7. What to consider? • What zoning areas should this be applicable to? • R6-R8 Multi Family? • Residential Office? • General Business? • General Business 2? • Industrial Zones? • Should existing plaza be retro fitted? • Substantial remodeling? • Expansion? • Could this be made incentive based? • Reduce parking required with Bike/Ped access?

  8. Potential Issues to consider • Small parking lots may have difficulty meeting the proposed regulations • The developer of the second lot to develop will have limited design options because an easement location has already been selected for the first lot to develop • How 10-1.11 High Density Development Option (Reserved) and 10-1.12 Stormwater Control Structures (Reserved) from the UDO could be affected or benefitted by this • Addressing the required landscape buffer • Establishing design/construction standards for vehicle interconnections (Driveway)

  9. Potential Wording • Create 13-2 of the UDO to address parking connectivity • Parking Connectivity- Adjacent parking lots shall be interconnected except in the case of existing steep topography between the sites. -Granite Quarry, NC-