1 / 19

Sonoma Marin Area Rail Transit (SMART)

Sonoma Marin Area Rail Transit (SMART). Analysis on the Effectiveness of the Proposed Rail System. MS&E 220 – Probabilistic Analysis Fall 2008 – Professor Samuel Chiu Prepared By: Samuel Gambrell Paul Jones David Williams December 4, 2008. Overview.

nedaa
Download Presentation

Sonoma Marin Area Rail Transit (SMART)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Sonoma Marin Area Rail Transit (SMART) Analysis on the Effectiveness of the Proposed Rail System MS&E 220 – Probabilistic Analysis Fall 2008 – Professor Samuel Chiu Prepared By: Samuel Gambrell Paul Jones David Williams December 4, 2008

  2. Overview • This analysis will examine the probabilities related to making a decision on whether to support the Sonoma Main Area Rail Transit system • This includes: • Creating a decision analysis tool • Examining input probabilities to the model • Ridership • Costs & Revenue

  3. Decision Analysis • This process used decision trees, to structure the probability inputs • Values of different outputs are assigned by the user • Feedback on whether they should or should not support the decision is provided • So is a measure of how much change is required for them to change their position

  4. Decision Tree: Yes or No to the Train

  5. Value from User Results and change of preference required to alter position

  6. Ridership Projections

  7. Population within 1 mile of station Calculation for Santa Rosa (special case overlapping station radii) Commuters within 1 mile of station are significantly more likely to use SMART Distance between Santa Rosa Stations = 1.18 milesTotal area of Santa Rosa within 1 mile of train station is = 5.36 square miles (see spreadsheet for calcs) Population Density for Santa Rosa = 3844 people per square mile Santa Rosa Residents within 1 mile of SMART station is = 3,844 x 5.3564 = 20590

  8. Low Projection:Assessed Ridership Conditioned on Proximity to Station and Commuter Status

  9. High Projection:Assessed Ridership Conditioned on Proximity to Station and Commuter Status

  10. Projected Riders vs. Gas Price E. D. C. B. A.

  11. Ridership Projections

  12. SMART Project Cost

  13. Sales Tax Growth • Obtained Taxable Income from Sales for 1998 thru 2007 through California BOE • Due to the complexity and uncertainties of a financial model a normal curve was used with the mean and SD of historical data to predict growth • Dynamic equations were used to predict Taxable Income till 2029

  14. Income predicted by SMART paper

  15. Model vs Paper • According to the model the paper has a 99.85% chance of making the predicted income from sales tax

  16. Assumed Income Currently unable to find a source for an accurate probability.

  17. Probability of a Cost Overrun • Based on Transit systems built since 1994 • Used to calculate the probability of a cost overrun • Assumed normal

More Related