Tampak timur

Tampak timur. MULLION TIPE 3 MOS 14 BTG lokasi siap braket siku 100x100 blm mos. MULLION TIPE 2 lokasi siap proses pasang ada terminal barang. MULLION TIPE 2 lokasi ending slab blm di cor mullion dan transome sudah siap. Tampak utara. Mullion blm masuk.

neena
Download Presentation

Tampak timur

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Tampaktimur MULLION TIPE 3 MOS 14 BTG lokasisiapbraketsiku 100x100 blmmos MULLION TIPE 2 lokasisiap proses pasangada terminal barang MULLION TIPE 2 lokasi ending slab blm di cor mullion dantransomesudahsiap

  2. Tampakutara Mullion blmmasuk Lokasisiap proses pasang MULLION TIPE 3 sudahmoslokasipemasanganadakendalabesi MULLION TIPE 3 lokasisiap mullion blmmos Lokasimenungguadaperkuatanbajaceremona by other Tipe 5 lokasisiapbajastuktureblm onsite masih proses penawaran

  3. Tampakbarat Tipe 4 lokasisiap mullion blmmos Tipe 1 lokasisiapmatrial mullion siap proses pasang Tipe 2 lokasibalokbermasalahmentokdengancurtin box pemasangan mullion di holt Tipe 1 lokasisiappasangtransome 72406 blmmos Tipe 1 lokasi ending slab blm di cor mullion sudahsiap di site Tipe 1 lantai 2 mullion mos 29 blmmoslagi

  4. Tampakselatan Rencanaposisialimak 2 Lantai 1 mullion siappasanglokasi ending slab blm di corlantai 2 lokasisiap mullion blmmos