1 / 4

Arrangement of detectors for beam test at FNBF by FIT & Uva Preliminary

Arrangement of detectors for beam test at FNBF by FIT & Uva Preliminary. Aug. 12, 2013. Detectors. FIT One 30cm GEM with 2 APV Two 10cm GEM with 2 APV totally One CMS GEM with 8 APV if zigzag r/o board is ready, otherwise there will need 24 APVs Uva Two 50cm GEM, ? APV

nelly
Download Presentation

Arrangement of detectors for beam test at FNBF by FIT & Uva Preliminary

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Arrangement of detectors for beam test at FNBF by FIT & UvaPreliminary Aug. 12, 2013

  2. Detectors • FIT • One 30cm GEM with 2 APV • Two 10cm GEM with 2 APV totally • One CMS GEM with 8 APV if zigzag r/o board is ready, otherwise there will need 24 APVs • Uva • Two 50cm GEM, ? APV • One MM detector, APV? • Or, two 10cm ref. detectors. APV?

  3. Electronics • FIT • 2 or 3 FECs, 2 ADCs • A 6U crate • A NETGEAR Switch • A Linux PC with amoreSRS software • Uva • SRU system?

  4. sketch 50cm GEM Two 10cm GEM w/ zigzag r/o 1cm MM chamber for ref. 10cm GEM for ref. 10cm GEM for ref. 30cm GEM w/ Zigzag r/o 50cm GEM for test and for ref. CMS GEM UVa or FIT UVa or FIT UVa UVa FIT UVa FIT

More Related