Summary of Techniques for Permit Compliance. Construction Site Management Erosion and Storm Water Management Certification Program 2013/2014 Dwayne Stenlund, MSc, CPESC Minnesota Department of Transportation Office of Environmental Stewardship. Summary.

nevan
Download Presentation

Summary of Techniques for Permit Compliance

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Summary of Techniques for Permit Compliance Construction Site Management Erosion and Storm Water Management Certification Program 2013/2014 Dwayne Stenlund, MSc, CPESC Minnesota Department of Transportation Office of Environmental Stewardship

  2. Summary • Don’t do or allow dumb things to happen • Plan your activities • Document and provide quality control • Preserve topsoil • Develop dewatering protocols • Keep the site clean • Know that it will rain • Defend the exits • Defend stockpiles • Stabilize the points of discharge • Stabilize the exposed soils • Build traps • Use chemicals in conjunction with other BMPs

  3. Dumb exit

  4. Work together

  5. Monitor the rain

  6. Keep a safe site

  7. Defend and maintain the inlets

  8. Get Serious. • Use high performance perimeters that fit the site conditions. • Superduty silt fence • Superduty silt curtain • Topsoil berms

  9. Follow the water

  10. Fix and document quickly

  11. See the obvious

  12. The program must change as the project changes. Change and amend the BMPs

  13. Life happens. Clean up when it does

  14. Keep a set of supplies on hand • Deploy them routinely

  15. Defend the stockpiles • All must have perimeter controls • Some must have stabilization • Constant vigilance

  16. Prepare to dewater, and hope you do not need to.

  17. Use the site conditions • Topsoil berms • Catwalk • Plastic/geotextile covers

  18. Stabilize the last 200 lf and within 24 hours

  19. Stabilize everything else not actively worked. • Keep the green space intact for as long as possible.

  20. Finish things.

  21. Manage concrete and other wastes.

  22. Develop action plans.

  23. Plan to amend the amendment.

  24. It leaves clean. • The lickable test.

  25. No pollutant is trivial.

  26. Good luck helps. • Good luck.