PLATO - TOU Mechanical Structure Feasibility

PLATO - TOU Mechanical Structure Feasibility. Osservatorio Astronomico – Catania June 11 th , 2014. Introduction. The material chosen for the structural tube is AlBeMet AM162 from Materion (former Brush Wellman), which consists of 62% Be and 38% Al.

nevin
Download Presentation

PLATO - TOU Mechanical Structure Feasibility

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PLATO - TOUMechanical Structure Feasibility Osservatorio Astronomico – Catania June 11th, 2014

  2. Introduction • The material chosen for the structural tube is AlBeMet AM162 from Materion (former Brush Wellman), which consists of 62% Be and 38% Al. • Beryllium dust is highly toxic, therefore special precautions are needed for machining, e.g. encapsulated machines. • Only few workshops available in Europe (UK, D, CH). • Coating companies not always treat Beryllium and its alloys. • ITAR situation: • Raw material just needs end user declaration. • (Semi-)finished parts are subjects to export restrictions.

  3. Feasibility Study • End of 2010 a contract was placed at APCO to carry out a feasibility study focused on: • Procurement of raw material • Machining • Coating (anorganic) • A report with ecouraging results was provided (A4.AN.37294, dated 10 May 2011). • Some weeks after formal contract closure coated samples from different suppliers were provided to UBE, whereby excellent results could be observed. • The outcome of the feasibility study was definitely positive.