An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. HIE-ISOLDE beam transfer lines magnets • LIU-SPS beam loss • Additional bumpers in LSS6 • J. Bauche, LIU-SPS beam loss WG, 12th December 2012.

  2. HIE-ISOLDE beam transfer lines magnets LIU-SPS bumper specification parameters

  3. HIE-ISOLDE beam transfer lines magnets • SPS vertical bumpers situation Proposal: manufacture 5 additional MPLV

  4. HIE-ISOLDE beam transfer lines magnets • Integration issue 61503 SSS 615 Availablelength = 860 mm SSS 421 MPLV + VC = 920 mm

  5. HIE-ISOLDE beam transfer lines magnets LIU-SPS bumper specification parameters Δ∫B.dl ≈ 18%

  6. Integration issue 61933 61933 Interference with TT60 vacuum chamber Half-cell 619 To be displaced here

  7. HIE-ISOLDE beam transfer lines magnets • Summary • Requests: • Need for 2 additional bumpers in half cells 617 and 619 • Need for stronger bumpers in 615 and 621 than present MPSV • MPSV spare situation is presently quite critical • Proposal: manufacture of 5 additional MPLV magnets as to • fulfill the LIU-SPS needs for the LSS6 scraping scheme • secure the spare situation for the long term • Integration issue in SSS 615 • Could be solved by design of more compact covers and upstream positioning of the bumper  feasibility TBC • EM cross-talk with adjacent sextupole TBC as well • Otherwise, check possibility to use present MPSV by increasing Ipeak to cover the missing 18% strength. Saturationand cooling TBC • Integration issue in SSS 619 • Could be solved by displacing downstream  feasibility TBC (optics) • Otherwise, need for new design, possibly with similar characteristics as MPLV