DESIGN TECHNICAL MEETING

PSB H- INJECTION DTM - 16.04.2014. DESIGN TECHNICAL MEETING. M. Garlaschè, B.Riffaud, L.Zuccalli. PROPOSAL FOR DESIGN PRIORITIES. Note : Design = 3D models + 2D drawings (layout & manufacturing). Priority 1 : design related to Half-Sector Test (HST)

nile
Download Presentation

DESIGN TECHNICAL MEETING

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PSB H- INJECTION DTM - 16.04.2014 DESIGN TECHNICAL MEETING M. Garlaschè, B.Riffaud, L.Zuccalli Marco Garlaschè, B.Riffaud, L.Zuccalli

  2. PROPOSAL FOR DESIGN PRIORITIES Note : Design = 3D models + 2D drawings (layout & manufacturing). • Priority 1 : design related to Half-Sector Test (HST) • P1.1 : BSW chambers (BSW1 included) + tooling. • INCONEL parts. • Solution for welding (including interface with BI.STR). • Racetrack bellows (bellow + collar). • Bellow compression tool. • Integration of BSW4 H0/H- dump + instrumentation. • Integration of BSW4 cooling. • P1.2 : Pumping ports. • P1.3 : BSW 2-3-4 magnet sub-assemblies (magnet, yellow support, chamber, shielding, RF contact,…). • Priority 2 : BHZ INCONEL chambers (2 types) • Priority 3 : BSW1 • P3.1 : Electrical connection. • P3.2 : BSW1 magnet sub-assembly. • Priority 4 : BLMs • Priority 5 : Main support structure • Priority 6 : Upstream and downstream vacuum modules • Priority 7 : Detailed H- Injection layout (2D assembly drawings) Important : this program depends on inputs coming from workpackages which are not part of EN-MME workpackage (BSW magnets, BI.STR unit, transport,…). Marco Garlaschè, B.Riffaud, L.Zuccalli

  3. PROPOSAL FOR DRAWING APPROVAL ARCHIVING PROCESS CDD CONTROL 1 (drawing formal check) : done by EN-MME. CDD CONTROL 2 (mechanical functional check) : done by EN-MME under equipment owner delegation. APPROVAL PROCESS (project level functional check) APPROVAL LEADER : Wim Weterings. EDMS DRAWING FOLDERS FOR APPROVAL : provided by EN-MME. APPROVAL LISTS • SYSTEM ASSEMBLIES & SUB-ASSEMBLIES • (assembly and sub-assembly drawings) • Bruno Balhan • Cédric Baud • Caterina Bertone • Jan Borburgh • Elena Benedetto • Chiara Bracco • Stéphane Burger • Alessandro Dallocchio • Tobias Dobers • Raul Fernandez Ortega • Robert Froeschl • Jan Hansen • Eva Barbara Holzer • Michael Hourican • Jean-Michel Lacroix • Cesare Maglioni • Anthony Newborough • David Nisbet  • Remy Noulibos • Michel Obrecht • Federico Roncarolo • Jocelyn Tan • Wim Weterings • Christos Zamantzas • Francesca Zocca • BSW MAGNETS • (+ powering, cooling, shielding, etc...) • Cédric Baud • Jan Borburgh • Tobias Dobers • Robert Froeschl • Michael Hourican • David Nisbet • Michel Obrecht • Wim Weterings • INTERNAL Dump & Instrumentation • Bruno Balhan • Jan Borburgh • Cédric Baud • Stéphane Burger • Alessandro Dallocchio • Robert Froeschl • Michael Hourican • Cesare Maglioni • Federico Roncarolo • Jocelyn Tan • Wim Weterings • Francesca Zocca • Vacuum equipment • Cedric Baud • Jan Borburgh • Alessandro Dallocchio • Jan Hansen • Michael Hourican • Cesare Maglioni • Remy Noulibos • Wim Weterings • EXTERNAL INSTRUMENTATION • Alessandro Dallocchio • Jocelyn Tan • Michel Obrecht • Wim Weterings • Christos Zamantzas • SUPPORT STRUCTURES • Caterina Bertone • Alessandro Dallocchio • Tobias Dobers • Raul Fernandez Ortega • Jean-Michel Lacroix • Wim Weterings • Stripping foil unit • Stéphane Burger • Alessandro Dallocchio • Jan Hansen • Remy Noulibos • Wim Weterings Marco Garlaschè, B.Riffaud, L.Zuccalli