1 / 26

THE 22@ PROJECT: Strategy

THE 22@ PROJECT: Strategy. Conclude the urban renewal of Poblenou Responding to the needs: the knowledge economy. Metropolitan Area of Barcelona. THE PROCESS OF URBAN TRANSFORMATION IN POBLENOU. THE PROCESS OF URBAN TRANSFORMATION IN POBLENOU. THE SCALA OF TRANSFORMATION.

Download Presentation

THE 22@ PROJECT: Strategy

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. THE 22@ PROJECT: Strategy • Conclude the urban renewal of Poblenou • Responding to the needs: the knowledge economy

  2. Metropolitan Area of Barcelona

  3. THE PROCESS OF URBAN TRANSFORMATION IN POBLENOU

  4. THE PROCESS OF URBAN TRANSFORMATION IN POBLENOU

  5. THE SCALA OF TRANSFORMATION • AREA: 198.26 ha., 115 blocks, 1,159,626 m² 22@ land • POTENTIAL MAXIMUM ROOF SPACE: 4.000.000 m² approx. • Production: 3.200.000 m² approx. • Other uses (facilities, housing,..): 800.000 m² approx. • HOUSING: • Accepted: 4.614 existing dwellings • New social housing: 4.000 approx. (minimum of at least 25% rented) • INCREASE IN GREEN SPACE: 75.000 m² approx. • NEW FACILITIES: 145.000 m² • NEW JOBS: 100.000 / 130.000 approx. • INVESTMENT IN INFRASTRUCTURE PLAN: 162.3 million Euro

  6. BASIC AIMS OF THE PROJECT @ Activities • Non-polluting, city friendly activities (ie. low noise levels, etc.) • Intensive use of space • Intensive use of qualified personnel • Intensive use of Information and Telecoms Technology

  7. BASIC AIMS OF THE PROJECT • Coexistence of different uses • Industry • Technology • Housing • Offices • Shops • Hotels • Corporate apartments • Facilities PGM’ 76

  8. 3 2,7 2,2 2 0 PUBLIC HOUSING @ ACTIVITIES • m² of roof per m² of land GENERAL PGM’ 76 GENERAL 22@ Plan BASIC AIMS OF THE PROJECT • Redensification

  9. MANAGING THE TRANSFORMATION A Municipal Corporation • Urban planning • Urban management • Infrastructure • Heritage management • In co-ordination with the urban planning authorities • Promotion

  10. PEI 22@: BASIC CONTENTS • Infrastructures implantations criteria • Analysis of the different systems: • Energy • Telecomunications • Hidraulic Cycle • Wastes and Cleaning • Accesibility and Public areas • Stage planning • Economical Funds from Land Use Tax (+roof, +value)

  11. ANALYSIS OF THE DIFFERENT SYSTEMS: ACCESSIBILITY AND PUBLIC SPACES www.bcn.es/22@bcn 22@mail.bcn.es

  12. ANALYSIS OF THE DIFFERENT SYSTEMS: ACCESSIBILITY AND PUBLIC SPACES • Application of the city modal split • Public Transport Infraestructures Previsions • Connections with the road network of the city • Road structure hierarchy • Intelligent systems for the traffic management • Car park standards in the sector

  13. Pedestrian roads proposals MOBILITY

  14. MOBILITY Infrastructure’s TrainProposals

  15. New Accesses in existing Line 4

  16. MOBILITY Planning Accessibility planning.Infrastructure Director Plan (PDI 2001-10)

  17. MOBILITY General View General Road Proposal

  18. MOBILITY Bicycle roads proposal

  19. MOBILITY Primary & Secondary Roads section

  20. MOBILITY Road network Plan

  21. www.bcn.es/22@bcn 22@mail.bcn.es