150 likes | 276 Views
Technical cooperation challenges. National planning for CNS/ATM systems for India. ICAO OVERALL PLANNING PROCESS STRUCTURE. GLOBAL AIR NAVIGATION PLAN FOR CNS/ATM. GUIDANCE. REGIONAL PLANNING PROCESS (7 Regions). NAT SPG. EANPG. NAM-PG. MIDANPIRG. GREPECAS. APANPIRG. APIRG.
E N D
Technical cooperation challenges National planning for CNS/ATM systems for India
ICAO OVERALL PLANNING PROCESS STRUCTURE GLOBAL AIR NAVIGATION PLAN FOR CNS/ATM GUIDANCE REGIONAL PLANNING PROCESS (7 Regions) NAT SPG EANPG NAM-PG MIDANPIRG GREPECAS APANPIRG APIRG NATIONAL PLANS
Technical cooperation project ICAO and India To structure a national plan for CNS/ATM systems
Mechanism Management Core group of national experts ICAO expert
Process • Established a continuous ongoing consultations within the core group and with the management • Adopted a systems approach providing end to end analysis encompassing critical issues
Critical issues • Technical audit • Air traffic forecasts • Airspace users requirements • Functional requirements
Critical issues (continued) • Cost benefit analysis • Sensitivity analysis • Implementation timelines • Harmonization
Interface with CNS/ATM systems partners • Military • Airspace users • Industry
Deliverables • CNS/ATM systems planning document • High level presentation
Extension to worldwide application • Request from States for similar assistance • In response a model national plan for CNS/ATM systems has been prepared
Model national plan for CNS/ATM systems • Serves as guidance material for the States • Comprises of comprehensive check lists, standard templates,decision trees and implementation tables
Model national plan (continued) • Covers cost/benefit studies including sensitivity analysis • Assist in harmonization of national plan with regional plan
Workshops on model national plan • Designed workshops with focus on <<hands on>> experience • Organized during 1997-98: 3 workshops for the States of MID region and 4 workshops for States of CAR/SAM region
Workshops on model national plan (continued) • Planned workshops during June-Dec 1998: • six workshops covering all the States of Africa • one workshop for eastern European States
Conclusion • ICAO has established a technical cooperation project in planning and implementation of CNS/ATM systems • States requiring assistance may avail this opportunity