TEPPC Test Dataset. Powerflow Data. Powerflow Data Overview. In the Test Dataset there are Three areas . Twenty-two busses. Twenty-five AC transmission lines. Three transformers One DC transmission line. One phase shifter. Bus Numbering Convention.

nizana
Download Presentation

TEPPC Test Dataset

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TEPPC Test Dataset

  2. Powerflow Data

  3. Powerflow Data Overview • In the Test Dataset there are • Three areas. • Twenty-two busses. • Twenty-five ACtransmission lines. • Three transformers • One DC transmission line. • One phase shifter.

  4. Bus Numbering Convention • The bus numbering scheme was set up to easily recognize which area a bus is located in. • Area 1 • Bus numbers are between 101 and 199. • There are seven busses in Area 1 (101 – 107). • Area 2 • Bus numbers are between 201 and 299. • There are seven busses in Area 2 (201 – 207). • Area 3 • Bus numbers are between 301 and 399. • There are eight busses in Area 3 (301 – 308).

  5. 102 500 kV 105 345 kV 101 104 Area 1 201 103 203 106 107 202 Area 2 204 Area 3 205 302 206 304 301 303 307 207 308 305 306

  6. Transmission Line Parameters • The transmission line parameters (impedances and flow limits) were calculated using the transmission line length and voltage class. • Voltage Classes: 345 and 500 kV. • Lengths: 50, 75, 100, 150 miles. • The line parameters were calculated to ensure • Transmission line impedance values and flow limits are consistent based on voltage class and length. • Realistic flow patterns and congestion patterns for the Test Dataset’snetwork topology.

  7. The transmission line impedances were calculated using typical per length impedance values (ohms / mile) for 345 and 500 kV lines (found in a GE reference manual). • The per length impedance values were converted to per-unit. • The per unit values were multiplied by each branch’s length to come up with a per-unit branch impedance. Calculating Transmission Line Impedances

  8. A powerflow text book was used as a reference to find • Typical SIL values for 345 and 500 kV transmission lines. • The practical line loadability (in pu of SIL) for 50, 75, 100, and 150 mile long lines. • The typical SIL values were multiplied by the practical line loadability (in pu of SIL) values to get the calculated branch flow limits. • The calculated branch flow limits were divided by 4.15 to get the Adjusted Values (the Adjusted Values are used in the Test Dataset). • The flow limits had to be reduced from the Calculated Values to cause congestion in the Test Dataset. Calculating Transmission Flow Limits

  9. 102 500 kV 1 1.5 105 345 kV 1 101 104 2 1 2 201 2 103 2 1 106 107 1.5 203 202 1 3 3 204 2 3 1 3 205 302 1 206 1.5 3 304 301 303 1.5 1 1 307 1.5 207 308 305 2 306 1

  10. Load Data

  11. There are three load Areas in the Test Dataset. • Area 1 is a winter peaking load area. • Area 2 and Area 3 are summer peaking load areas. Load Data Overview

  12. Hourly Load Data Graph

  13. System Load Busses • There are three load busses in each Area. • Area 1 • The load at Bus 102 consumes 30% of Area 1 load. • The load at Bus 103 consumes 20% of Area 1 load. • The load at Bus 105 consumes 50% of Area 1 load. • Area 2 • The load at Bus 203 consumes 50% of Area 2 load. • The load at Bus 204 consumes 20% of Area 2 load. • The load at Bus 206 consumes 30% of Area 2 load. • Area 3 • The load at Bus 301 consumes 50% of Area 3 load. • The load at Bus 305 consumes 30% of Area 3 load. • The load at Bus 306 consumes 20% of Area 3 load.

  14. 102 500 kV ASE - Annual System Energy HAL - Hourly Area Load 8% ASE 30% HAL (254-554) MW 105 345 kV 13% ASE 50% HAL (424-924) MW 101 104 201 103 5% ASE 20% HAL (170-369) MW 203 106 107 13% ASE 50% HAL (406-929) MW 202 204 5% ASE 20% HAL (162-371) MW 205 8% ASE 30% HAL (243-557) MW 302 206 303 24% ASE 50% HAL (686-1970) MW 304 301 307 308 14% ASE 30% HAL (412-1182) MW 305 306 9% ASE 20% HAL (274-788) MW 207

  15. Generator Data

  16. Generator Overview • There are 63 plants with a combined total of 8630 MW of Installed Capacity. • Thermal Resource Types • Nuclear, Coal, Combined Cycle (CC), Combustion Turbine (CT), Internal Combustion (IC), Steam. • Renewable Resource Types • Biomass (Bio), Geothermal (Geo), Wind, Solar • Other • Hydro, Pumped Storage, Demand Side Management (DSM)

  17. Generator Naming Convention • Each generator’s name is derived from it’s gen type and the bus number it is located on. • For example • Coal_104 -> Coal plant on bus 104. • Nuclear_301 -> Nuclear plant on bus 301. • Wind_101 -> Wind farm on bus 101. • CC_103 -> CC plant on bus 103. • CT_305 -> CT plant on bus 305. • CT_305a -> Another CT plant on bus 305. • CT_305b -> Yet another CT plant on bus 305.

  18. Generator Parameters

  19. Installed Capacity

  20. Generator Count / Installed Capacity

  21. Thermal Dispatch Order • Based on the heat rates and fuel prices the resources will tend to be dispatched in the following order • Nuclear, Coal, CC, CT, IC, Steam, DSM • Nuclear and Coal plants are base loaded. • CC plants tend to move with the load. • CT and IC plants typically are used to meet peak load and spinning reserve requirements. • Steam resources are inefficient and typically used only during hours of peak load. • DSM is very inefficient and used sparingly.

  22. Incremental Cost Curves

  23. Average Cost Curves

  24. 102 500 kV 105 345 kV 101 104 Area 1 201 103 203 106 107 202 Area 2 204 Area 3 205 302 206 304 301 303 307 207 308 305 306

  25. 102 Area 1 500 kV 101 Hydro_102 CT_102 400 MW Hydro_105 CC_105 CT_105 CT_105a DSM_105 800 MW 105 345 kV 104 ASE - Annual System Energy HAL - Hourly Area Load 8% ASE 30% HAL (254-554) MW 103 Wind_101 150 MW 13% ASE 50% HAL (424-924) MW 106 Coal_104 300 MW 107 Hydro_106 CT_106 400 MW CC_103 CT_103 Coal_103 650 MW 5% ASE 20% HAL (170-369) MW

  26. CC_203 CT_203 CT_203a CT_203b IC_203 Steam_203 DSM_203 730 MW Wind_201 150 MW Area 2 500 kV 345 kV ASE - Annual System Energy HAL - Hourly Area Load 13% ASE 50% HAL (406-929) MW Wind_202 Pump Storage_202 250 MW 201 CT_204 CT_204a IC_204 130 MW 203 202 5% ASE 20% HAL (162-371) MW 204 Coal_206 Coal_206a CC_206 Steam_206 1100 MW 205 8% ASE 30% HAL (243-557) MW 206 Solar_207 Solar_207a CT_207 150 MW 207

  27. Area 3 500 kV 345 kV 302 Wind_302 150 MW ASE - Annual System Energy HAL - Hourly Area Load 304 Nuclear_301 CC_301 CT_301 CT_301a CT_301b Steam_301 Steam_301a DSM_301 DSM_301a 1350 MW 301 303 24% ASE 50% HAL (686-1970) MW Hydro_303 Geo_303 CT_303 430 MW 308 307 306 305 CT_305 CT_305a CT_305b IC_305 Steam_305 Steam_305a DSM_305 DSM_305a Pump Storage_305 780 MW 14% ASE 30% HAL (412-1182) MW 9% ASE 20% HAL (274-788) MW CC_306 Bio_306 CT_306 IC_306 Steam_306 DSM_306 660 MW Solar_308 50 MW

  28. Other Relevant Information • No Forced Outages. • No Scheduled Outages. • PLF is used to model Hydro with a k factor of 1 and a 70% capacity factor. • Spinning reserve requirements for each area are 6% of load. • Fuel prices are given below.