Retail Market Subcommittee Update to TAC. January 6, 2005. Agenda. Voting Items Annual Validation Report to the ERCOT Board (Revised) RMGRR 017 – Transaction Timing Matrix RMGRR 016 – Oncor Name Change to TXU Electric Delivery Non-Voting Items Load Research Sampling (LRS) Project Update.
E N D
Retail Market SubcommitteeUpdate to TAC January 6, 2005
Agenda Voting Items Annual Validation Report to the ERCOT Board (Revised) RMGRR 017 – Transaction Timing Matrix RMGRR 016 – Oncor Name Change to TXU Electric Delivery Non-Voting Items Load Research Sampling (LRS) Project Update
Voting Items Annual Validation Report to the ERCOT Board (Revised) Do not replace a prior year non-default assignment with a default assignment Apply dead-bands around the specified Residential Segment trigger point Apply a kWh minimum for Residential High Winter Ratio profile assignment Review use of more stable Residential Winter Ratio formula. RMGRR 017 – Transaction Timing Matrix TITF initiative Capture the modifications to Chapter 15 Minor editorial changes RMGRR 016 – Oncor Name Change to TXU Electric Delivery Name change only All sections affected
Load Research Sampling (LRS)Project Summary As presented by ERCOT for RMS Meeting – 12/16/2004
LRS Project Summary -- Project • Background • Purpose: To collect load research data to support ERCOT’s load profiling efforts. The LRS data will be used to improve profiles and increase the accuracy of settlements. • ERCOT’s responsibility – to select the load research samples and make the Load Profile data available to market participants. • Sample locations were selected to distributed among each of 6 profile types and 8 weather zones. • Profile Types = Residential Low Winter Ratio, Residential High Winter Ratio, Business No Demand, Business Low Load Factor, Business Medium Load Factor, Business High Load Factor • Weather Zones = Coast, East, West, Far West, North, North Central, South, South Central • TDSPs responsibility – to install IDR meters for data collection; performing VEE on collected data; and transferring data to ERCOT
NAESB EDM v1.6 5 TDSPs MV90 HTTPS (FTP Replacement) ERCOT IDR IDR CR CR IDR IDR IDR IDR CR CR IDR IDR CR CR IDR IDR CR CR IDR IDR CR CR CR CR CR CR CR CR LRS Data Flow NOT USING EDI TRANSACTIONS
LRS Project Summary -- Project • Project Measurement and Metrics • Timeline • Project start date – May 2003 • Project Deployment date – November 2004 • ERCOT Budget • Original Project Budget -- $1.5M • Actual charges to date -- $700k (Not including TDSP expense) • (5) TDSPs Commitment • All TDSPs completed Pilot testing • Installed over 4200 IDR sample points • Sample point readings have been transmitted to ERCOT starting in August 2004 • (13) CRs Commitment • All CRs have completed Pilot testing • ERCOT is in the process of building systems to transmit data to CRs
LRS Project Summary • Market Summary • TDSP Installation update as of 12/1/2004 • Ongoing ERCOT Responsibility • Verify sample point installation and transaction confirmation underway • Work with TDSPs on remaining installations and replacements (on-going) • Transition to O&M role for sample point management and tracking • Provide data to Market Participants as required
??? Questions ???
Voting ItemsPWG Action Plans Do not replace a prior year non-default assignment with a default assignment A new calculation for each ESI ID is made each year Currently: Insufficient data requires assignment to default Residential defaults to Residential Low Winter Ratio (RESLOWR) Commercial defaults to Business Medium Load Factor (BUSMEDLF) Proposed: If sufficient data was available in a previous year an assignment to default would not be made
Voting ItemsPWG Action Plans Applying dead-bands around the specified Residential Segment trigger point Currently: If WR > 1.5 it is assigned to High Winter Ratio (HiWR) Proposed: Create a dead-band around the 1.5 trigger point Example – Assume dead-band (1.0 to 2.0) if current assignment is RESLOWR and new WR = 1.7, would remain RESLOWR if current assignment is RESLOWR and new WR = 2.1, would change to RESHIWR Result - significant reduction in migration
Voting ItemsPWG Action Plans 3.Use more than 1 month for the Residential Winter Ratio formula Example –Change numerator to average the ADU for highest 2 months Result - significant reduction in migration
Voting ItemsPWG Action Plans 4. Apply a kWh minimum for Residential High Winter Ratio profile assignment Currently: None Proposed: Identify a reasonable minimum usage for High Winter Ratio assignment Example – RESHIWR minimum = 10 kWh/day (300kWH/month) If WR = 3.0 and 5 kWh/day then assign RESLOWR If WR = 3.0 and 15 kWh/day then assign RESHIWR
Voting ItemsPWG Action Plans Use an ERCOT administered residential survey to determine heating system type for a sample of customers The survey will empirically support data used to define dead-bands, minimum thresholds and revised WR calculation 40,000 surveys will be mailed to end use customers 5,000 to each weather zone 2,500 to each existing profile type current assignment