1 / 1

SMHI operational HIRLAM EWGLAM 2004 4 - 7 October , OSLO Lars Meuller SMHI

SMHI operational HIRLAM EWGLAM 2004 4 - 7 October , OSLO Lars Meuller SMHI. Operational HIRLAM 4 forecasts every day. HIRLAM22 and HIRLAM11 00z, 06z, 12z, 18z HIRLAM22 analysis + 48 hour 2 hours cutoff HIRLAM 11 analysis + 24 hour

noel-noble
Download Presentation

SMHI operational HIRLAM EWGLAM 2004 4 - 7 October , OSLO Lars Meuller SMHI

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SMHI operational HIRLAMEWGLAM 2004 4 - 7 October , OSLOLars Meuller SMHI • Operational HIRLAM • 4 forecasts every day. • HIRLAM22 and HIRLAM11 • 00z, 06z, 12z, 18z • HIRLAM22 analysis + 48 hour • 2 hours cutoff • HIRLAM 11 analysis + 24 hour • 1 hour 15 min cutoff • ECMWF preprocessing • SYNOP, TEMP, PILOT, • BUOY, AIREP, AMDAR • ATOVS AMSU-A radiances – • EARS ( over sea ) • VAD-winds passive • HIRLAM22 • 40 levels, 0,2O (22km) • horizontal resolution • 306x306 gridpoints • ECMWF boundaries every 3h - BC • Semi-Lagrangian time stepping • 10 min • HIRLAM11 • 60 levels, 0,1O (11km) • horizontal resolution • 246x268 gridpoints • HIRLAM22 boundaries • Semi-Lagrangian time stepping 5 min • Hirlam system • HIRLAM version 5.1.4 • 3D-VAR analysis • DFI initialisation • ISBA ( surface scheme ) • CBR ( turbulence ) • Kain-Fritsch ( convection ) • Rasch-Kristjansson ( large scale ) • MPI parallel • PLANS • Hirlam version 6.3.4 • 4D-VAR on limited area • improved treatment of • snow in ISBA • new observations • VAD wind profiles • GPS humidity • AMSU-B humidity • ( over sea ) • test of non hydrostatic • model 10 m wind Coastal stations precip Computer system at theNational Supercomputing Centreat Linköping University www.nsc.liu.se Operational : PC-cluster HOME-MADE Linux RedHat Intel, GNU and PGI compilers ScaMPI, MPICH,LAM mpi-lib Intel MKL – Math Kernal Library Open PBS batch system • Backup: SGI ORIGIN 3800 • 128 MIPS R14000 processors • 128 GFLOPS peak performance • 128 GB shared memory • IRIX operating system • LSFbatch system New cluster > 80 PE discussions started

More Related