1 / 11

MTAC Address Quality Steering Committee

MTAC Address Quality Steering Committee.

Download Presentation

MTAC Address Quality Steering Committee

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MTAC Address Quality Steering Committee

  2. Summary of Activity:Steering Committee met on July 19, 2005Goal: To achieve excellence in Address QualityObjective: To achieve significant reductions in UAA mail and Increase Address Accuracy, enabling a higher percentage of accurate 11-digit address coding

  3. MTAC Work Group #97Address Quality MethodologySponsors:Industry: Jim Schemmel, Joe Lubenow USPS: Charles Bravo, Nick BarrancaWork Group Leaders: Industry: Chris Lien, FirstlogicUSPS: Jim Wilson, Wayne Orbke

  4. MTAC Work Group #97 Area of Focus – Address Accuracy Evaluate existing AQ methodology Identify New Options Focus on Excellence

  5. MTAC Work Group #97 Overarching Issues • Address by Address Level AQ documentation • Mailing List Certification methodology • Complete and Correct Addressing • Electronic Mail Stream Address Validation

  6. MTAC Work Group #97 Desired Result Identify methodology changes needed to support the achievement of the USPS goal of 50% reduction in UAA mail by 2010 and for all mail to have accurate 11 digit barcodes Expected Date of Completion – March 31,2006

  7. MTAC Work Group #98Address Quality ToolsSponsors:Industry: Jim Schemmel, Joe LubenowUSPS: Charles Bravo, Nick BarrancaWork Group Leaders:Industry: Carole Morrow, BMG DirectUSPS: Ruth Jones, Charles Hunt

  8. MTAC Work Group #98 Area of Focus – Address Accuracy Evaluate how the Address Change Service (ACS) can be made more useful for Standard Mail Identify Potential New “Electronic Only” ACS Options

  9. MTAC Work Group #98 Overarching Issues • Manual Return Volumes on ACS mailings • ACS Returns to Rental List Owner • Expense of “weighted fee” Manual Returns

  10. MTAC Work Group #98 Desired Result A list of proposed changes designed to eliminate the negative effects of manual returns that are believed to be limiting the use of ACS as a Standard Mail AQ tool. Expected Date of Completion – March 31,2006

  11. Thank You

More Related