An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CTARASummer Internship Project Status Report 10-Jun-2010

  2. Outline • Project Summary • Considerations • Achieved so far • What needs to be done • Gallery

  3. Project Summary • Techno-economic feasibility study of a piped water distribution for north Karjat • Optimization of design • Approximately 100 hamlets • Almost no water in the region from February to monsoons • Groundwater supplies (wells, handpumps) dry up • Rivers dry out • Not enough Dams

  4. Considerations • Source identification • Population forcasting • Cost of materials and labor • Per capita demand • Topographical data of region (elevation, latitude, longitude) • Optimization of pipe diameters and economic velocity of water

  5. Achieved so far • Selection of target area • Construction of detailed, high resolution maps of the region • Digitization of population data (obtained with the help of Disha Kendra and Tehshil’s office) and lat/long and elevation of hamlets • Multiple visits to Mr. Ade at Minor Irrigation, Maharashtra JeevanPradhikaran (MJP) and Disha Kendra for guidance • Field visit with MJP to Anjap Project

  6. Achieved so far • Used different methods to forcast population till 2050 (arithmetic, geometric, graphical, incremental increase) • Detailed study of design software EPANET 2.0 and optimization program Branch 3.0 and Loop 4.0 • Creation of primary and secondary sample designs for testing • Visited TATA Powers office for permission to visit their Bhivpuri hydro-power station

  7. What needs to be done • Break target region into small clusters based on elevation and relevant distances • Streamline design process (building of high resolution maps and data entry) • Collect population data for villages not included in census • Create a series of sample designs to present to MJP for advice • Detailed exploration of lift-up points: Pej River, Poshir, Barvi Dam, Bhivpuri • Find a reliable information source for river discharge data

  8. Gallery