120 likes | 251 Views
Officer in Charge of Construction Marine Corps Installations West. 144 Active MILCON/M2R2 projects for $1.1B MCB Camp Pendleton: 68 projects ~ $677M MCAS Pendleton: 6 projects ~ $19.4M MCAGTFTC Twentynine Palms: 31 projects ~ $184M MCAS Miramar: 14 projects ~ $85.6M
E N D
Officer in Charge of Construction Marine Corps Installations West
144 Active MILCON/M2R2 projects for $1.1B • MCB Camp Pendleton: 68 projects ~ $677M • MCAS Pendleton: 6 projects ~ $19.4M • MCAGTFTC Twentynine Palms: 31 projects ~ $184M • MCAS Miramar: 14 projects ~ $85.6M • MCAS Yuma: 17 projects ~ $74.4M • MCLB Barstow: 6 projects ~ $14.5M • MCLB Bridgeport: 2 Projects ~$3.5M OICC MCIWEST “In Box”
OICC MCIWEST Programs Grow the Force - $3,000,000,000 (That’s $3.0 Billion) Bachelor Enlisted Quarters – 49 BEQs $1.7B
09 09 09 09 09 09 09 09 09 09 09 09 09 09 09 09 09 09 09 09 09 09 09 09 West Project Laydown FY09 42 Projects $1.1B BEQ Project Other MILCON Project 1 Project @ $8M 4 Projects @ $146M 26 Projects @ $800M 8 Projects @ $120M 1 Project @ $19M
10 10 10 10 West Project Laydown FY10 52 Projects $1.5B MCMWTC Bridgeport 2 Projects @ $7M BEQ Project Other MILCON Project 2 Project @ $36M 21 Projects @ $536M 22 Projects @ $1105M 3 Projects @ $80M 2 Projects @ $29M
BEQ Initiative • The Old: • 1950’s BEQs • Open Bays, Gang Heads
Best of Breed Exterior Positive, home-like appearance Building masses broken up into smaller portions, creating more of a campus like and community feel Breezeways Sports courts, BBQs Complies with BEAP Interior Hotel-like lobby at the entrance to the building Maximize natural ventilation in sleeping rooms Maximize storage space Telephone, cable and satellite TV Enhanced activity centers with gaming, internet, big screen TV, laundry rooms Ceiling fans, color schemes BEQ Initiative • The New:
Green Initiatives Buildings • LEED Silver Certification required for all FY09 new construction projects or renovation > 50% PRV • 3 LEED Silver Certified projects to be completed by summer 2009 • MCCS Temporary Lodging Facility 14% more efficient than Title 24 requirements, 30% water use reduction Wastewater • P-002 Southern Region Tertiary Treatment Plant – capable of treating 5 MGD • MCB P-110 Wastewater and Reclaimed Water Conveyance Systems saving 100 MGY using recycled water for irrigation
Water MCAS Miramar is saving 30 million gallons of potable water per year by using recycled water for irrigation, dust control, construction use Irrigation accounts for 60% of water load at Miramar. Converting to a central irrigation control system which monitors and accounts for rain fall has cut irrigation expense by half Power Installation of 23kW PV array to reduce net power consumption Solar powered speed limit sign installation in housing areas Installation of 5KV photovoltaic system to gym facility offsets power requirements from grid Green Initiatives
Green Initiatives • Photovoltaic Lights • 50 PV Lights on Base • Wind Turbine • 1.5MW • $6.1M / $1.5M SCE rebates