An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. La Pata Avenue Gap Closure and Camino Del Rio Extension American Society of Civil Engineers March 15, 2011 Harry Persaud, AICP, PMP

  2. Project Location

  3. Project Location

  4. Project Background • La Pata Avenue included on Orange County Master Plan of Arterial Highways (MPAH) since 1963 • La Pata and Camino Del Rio shown on City of San Clemente General Plan since 1982 and Talega and Forster Ranch Specific Plans • The existing La Pata Avenue built in the 1970s as a "dead-end" landfill access road • Project initiated in 2005. Three years of coordination with City and resident groups resulted in an alignment responding to concerns of proximity, light and glare, and aesthetics.

  5. Project Location

  6. Implement Orange County MPAH, Circulation Elements of San Clemente and San Juan Capistrano, and Specific Plans for Talega and Forster Ranch Provide north/south access for local traffic Improve access to schools, commercial areas, and recreational amenities Improve emergency access Reduce Vehicle Miles Traveled (VMT) and greenhouse gas emissions Project Purpose and Objectives

  7. Project Purpose and Objectives(continued) • Facilitate local inter-community circulation • Provide increased network capacity to support the forecast travel demand for the 2035 design year • Minimize impacts to utility transmission infrastructure • Minimize impacts to existing residential land uses • Minimize impacts to the natural environment

  8. Proposed Project Alignment

  9. Proposed Project • Widen La Pata Avenue from three to five lanes from Ortega Highway to the existing road terminus at the Prima Deshecha Landfill (PDL) – a distance of 9,600 feet • Construct four new lanes from the existing PDL terminus to Calle Saluda – a distance of 10,100 feet • Extend Camino Del Rio, as a four-lane roadway, from its existing terminus to the proposed Avenida La Pata – a distance of 1,700 feet • Estimated Total Cost: $77,368,000

  10. Proposed Project • Lighting will be provided along Camino Del Rio, on La Pata between Calle Saluda and Camino Del Rio, and on La Pata north of the landfill entrance to the project limits. • Sidewalks will extend along Camino Del Rio to La Pata and on the west side of La Pata from Calle Saluda to Camino Del Rio and from Vista Montana north to the project limits. • Bike lanes will be provided along both La Pata and Camino Del Rio. San Clemente’s off-road bike path east of La Pata will be extended north to the city limits. • The roadway project requires grading of 9 million cubic yards. 3 million cubic yards are required to balance the roadway. The remaining 6 million cubic yards are required to stabilize a large landslide complex. All earthmoving is balanced on site.

  11. Alternatives

  12. Aesthetics (Views) Air Quality (including Green House Gases) Biological Resources Cultural Resources Geology and Soils (landslides) Hydrology and Water Quality Hazards and Hazardous Materials Land Use and Planning Noise Public Services and Utilities Recreation (Multi-use Trails) Traffic and Circulation Environmental Issues Addressed

  13. Community Impacts Electric Transmission Facilities Prima Deshecha Landfill Geology Water Quality Engineering Challenges and Solutions

  14. Talega Community Workshops Horizontal & Vertical Alignment Refinements 7% Grade Design Deviation Berms to reduce visual impacts Forster Ranch Trailhead parking La Pata Trail Over-crossing Rubberized Asphalt to Reduce Noise Impacts Design Challenges & Solutions

  15. Electric Transmission Facilities Solution • Early Coordination Workshops with SDG&E and SCE • 7% Grade Design Deviation • Tower relocation Plan Coordinated with SDG&E • Facility Access Plans Incorporated into Design

  16. Prima Deshecha Landfill Solution • Design Addresses Existing Access Requirements to Zone 1 • Design Addresses Future Access Requirements to Zone 4 • Three Bridge Structures eliminate need for signalized intersection access • Grade separations will maintain access to and between Zone 1 and Zone 4

  17. Landslides in Project Area

  18. Landslide C Remediation Concept 2 million c.y. Buttress Fill 9 million c.y. Excavation 9 million c.y. removal 2 million c.y. buttress fill 3 million c.y. to balance roadway grading 4 million c.y. recompaction consistent with landfill general development plan

  19. Geotechnical Solutions • Identified Remediation Concepts to assure construction feasibility • Remediation Plan to accommodate roadway construction and landfill operations • Remediation Concept to balance earthwork on site.

  20. Water Quality Solutions • Six water quality basins to provide load reductions and detain runoff • Bio-retention planter boxes proposed in constrained right of way areas

  21. Significant Unavoidable Impacts • Traffic: • 2016 – I-5 Northbound ramps/Avenida Pico and I-5 Northbound direct on-ramp from Crown Valley Parkway • 2035 Without SR-241 Scenario – I-5 Northbound ramps/Avenida Pico • Improvements currently being planned and funded by M2 will reduce impacts. • Air Quality: Construction Emissions – CO, ROC, NOX, PM10, and PM2.5 • Contributions to regional air quality thresholds • Localized Impacts – Worst Case Assumptions • Noise: Increased traffic on Camino Del Rio forecast to exceed 65 dBA at 6 modeled locations • Several 4-foot noise walls are recommended and will reduce significant impacts.

  22. Visual Simulation Near Calle Gaulteria Existing With Roadway

  23. Visual Simulation onForster Ranch Ridgeline Trail Existing With Roadway

  24. Aesthetics – Cross Sections

  25. Traffic - Study Area

  26. 2016 Daily Traffic Volume 38 39 282 274 13 6 4 33 33 53 51 Without Project With Project

  27. 2035 Daily Traffic VolumeWithout SR-241 41 54 313 27 336 8 5 38 38 59 64 Without Project With Project

  28. 2035 Daily Traffic VolumeWith SR-241 43 41 294 291 15 5 8 28 29 51 51 Without Project With Project

  29. Vehicle Miles of Travel • A Comparison of daily vehicle miles travelled (VMT) within the study area shows the following reductions as a result of the project.

  30. Noise – Monitored Locations

  31. Proposed Noise Mitigation (Del Rio)

  32. Projected Traffic Noise Levels

  33. Recreation

  34. EIR Process Public & Agency Review and Comment Public & Agency Review and Comment Public & Agency Review Prepare Technical Studies EIR Certification Draft EIR Final EIR NOP County Board of Supervisors Meeting San Clemente and County Planning Commission Hearings Scoping Meeting Public Meeting

  35. Community Outreach • San Juan Capistrano Transportation Commission – November 10 at 6:00 p.m. • Mission Viejo City Council Briefing – November 15, 2010 at 6:00 p.m. • San Juan Capistrano City Council Briefing – November 16, 2010 at 6:30 p.m. • San Clemente Planning Commission Briefing – November 17, 2010 at 7:00 p.m. • Public meeting – November 18, 2010 at 7:30 p.m. • Ladera Ranch Civic Council Briefing – November 22, 2010 at 7:00 p.m. • Forster Ranch HOA meeting – December 7, 2010 at 6:00 p.m. • San Clemente Planning Commission Hearing – December 8, 2010 at 7:00 p.m.

  36. Project Schedule

  37. Questions?