50 likes | 174 Views
VOCALS Regional Experiment (REx) Action Items. Robert Wood, University of Washington many contributors. REx Action Items. Establish REx real-time forecasting task force Model source data/centers Trajectory generation Forecasters (Chilean Weather Service) Field Catalog
E N D
VOCALS Regional Experiment (REx)Action Items Robert Wood, University of Washington many contributors
REx Action Items • Establish REx real-time forecasting task force • Model source data/centers • Trajectory generation • Forecasters (Chilean Weather Service) • Field Catalog • Data questionnaire, satellite datasets, real-time MODIS products, Stratus 07 catalog • Establish Working Group with representatives from Operational Centers, JOSS. Goal is to populate the Field Catalog with model information, data, etc • Outreach/Education • Windows to the Universe group • Graduate student field experience reports • Land site coordination • Power sources, local coordination, site visit
Action Items • Pre-VOCA: • Participants to receive the first set of figures prepared at U. Washington/UCLA for preliminary round of discussions. Efforts to be made in order to incorporate data from Stratus Field Campaigns for model validation. • Dataset for Upwelling Regions of the World: • Establish Working Group to develop a comprehensive dataset, starting with VOCALS and continuing with the historical record going as far back as possible as much as possible. Peruvian nominations available. • Establishment of Working Group on Emissions: • Initial emphasis on smelters and power plants affecting SEP. Develop emission dataset and emission scenarios for • VOCALS modeling experiments (Jerome Fast?)
Action Items • Request permission from Dudley Chelton to place his ocean eddy statistics in VOCALS web page. • Establish group of scientists that will provide support for Operations in the field (Review of how objectives are been met, etc) • VOCALS SWG nominations due at the VAMOS Panel meeting, March 25-28, Miami, Fl
Actions items- ships/ocean • RH B Leg 1 – finalize load plans (containers/instruments, dates (Charleston, Miami) • RH B Leg 1 – work out personnel transfer in Colon • RH B Leg 1 – RV Olaya coordinate sampling • RH B leg 1/2 – submit clearance requests (Peru, Ecuador, Colombia, Chile), develop crew lists and personnel info, submit draft Cruise Instruction, paperwork foreign personnel on RH B; start detailed manifests and Hazmat documents (weights, volumes, placement an early need) • RH B leg 2 – develop ocean sampling plans, Leg 2 sampling scenarios • RH B leg1/2 – need CTD with rosette, fluorometer,… • RH B leg 1 – unload in Arica, what? • RH B leg 1 to 2 – ship personnel in Arica, coordinate logistics; coordinate on visits to ship (port passes, foreign nationals, ….), coordinate on public relations for ship • RH B personnel – TB test within the year of Oct/Nov 2008; NOAA health form mandatory; check visa requirements per your nationality; all computers up to date on virus checks, may need list of your computers, operating systems