200 likes | 300 Views
Light 1. Project Layout. C. 70” . AFF. AFF is the abbreviation for. After first fire Above finished floor Above flat floor At first floor Average floor finish . Light 1. Project Layout. C. 70” AFF . C is the abbreviation for. Clear left Center low Clear line Center line
E N D
Light 1 Project Layout C 70” AFF
AFF is the abbreviation for • After first fire • Above finished floor • Above flat floor • At first floor • Average floor finish
Light 1 Project Layout C 70” AFF
C is the abbreviation for • Clear left • Center low • Clear line • Center line • Correct line
SUPPORTING your BOXES
How many screws are needed when installing a box • 4 • 3 • 5 • 2 • 1
The proper direction of an eyehook is • To the left and up • To the right and up • To the left and down • To the right and down • To the left then to the right
Staples shall be installed • 12 inches from a box and 3-1/2 feet thereafter • 8 inches from a box and 4-1/2 feet thereafter • 12 inches from a box and 4-1/2 feet thereafter • 10 inches from a box and 4 feet thereafter • 12 inches from a box and 4 feet thereafter
After you cut your pipe, you shall • Polish the pipe • Ream the pipe • Install the pipe • Measure the pipe • File the pipe
Connecting your Devices SILVER screws COLORS
SILVER terminal screws are for • Black wires • Green wires • Yellow wires • Red wires • White wires
Connecting your Devices BRASS screws COLORS
BRASS terminal screws are for • Black wires • Green wires • Yellow wires • Red wires • White wires
Sheathing in the Box Cable sheathing NM cable Lock-nut Box connector
How much sheathing shall be visible inside your box at the box connector • ¼ inch • ½ inch • 1/8 inch • ¾ inch • 5/8 inch
Connecting your Devices GREEN screws COLORS
GREEN terminal screws are for • Yellow wires • Green wires • Red wires • Bare wires • White wires