1 / 10

SC6 Work Group on VR Plugs

SC6 Work Group on VR Plugs. SC6 Summer Meeting June 27, 2013 Bob Barnett / Jean Brunjes. SC6 Work Group on VR Plugs. June 2013 Update 4 ” HPVR plug and prep analyzed Prototype manufactured and undergoing PR2 test

nysa
Download Presentation

SC6 Work Group on VR Plugs

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SC6 Work Group on VR Plugs SC6 Summer Meeting June 27, 2013 Bob Barnett / Jean Brunjes

  2. SC6 Work Group on VR Plugs • June 2013 Update • 4” HPVR plug and prep analyzed • Prototype manufactured and undergoing PR2 test • After successful test, a modified Annex L will be submitted to TG2 (21st edition TG)

  3. SC6 Work Group on VR Plugs • Back-up slides

  4. SC6 Work Group on VR Plugs • Item 1: API 6A Annex L precludes the use of 15M-20M preps in 2M-10M outlets. • Item 2: There is no 15M-20M prep for the 4-1/16” outlet. • Item 3: Existing service tools may not be able to make up or break out the 4-1/16” 10M VR plug.

  5. SC6 Work Group on VR Plugs • Summary of WG Activities • Allow the use of the HPVR preps in 2M-10M outlets. • Develop a plug and prep for the 4-1/16” HPVR. • Remove 4” VR preparation and plug dimensions from 2M-10M tables.

  6. SC6 Work Group on VR Plugs • Summary of WG Activities • Refer to the preps and plugs as “VR” for 2M-10M. • Refer to the preps and plugs as “HPVR” for 15M-20M. • Add “ASME B1.8 Stub Acme Threads to Section 2 (Reference Standards). • Remove 2nd sentence of 1st paragraph of 10.22.1 – ‘four sizes and 2 pressure ratings’.

  7. SC6 Work Group on VR Plugs • Summary of WG Activities • Remove Section L.4 (duplicate of 10.22.4 - Materials). • Remove Section L.5 ( duplicate of 10.22.6 – QC). • Remove L.7 (duplicate of 10.22.7 – Marking). • Remove L.8 (duplicate of 10.22.8 – Storing and Shipping).

  8. SC6 Work Group on VR Plugs • Plan Forward • Confirm dimensions for 4-1/16” HPVR plug and prep. • Complete the analysis of the 4-1/16” HPVR plug and prep. • Prepare annex for ballot. • Send annex and analysis (as supporting documentation) to API for ballot distribution.

More Related