An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Objectives & generalities about phasing andThe phasing roadmap Claude Fischer

  2. Content: • Software interaction IFS-Arpège // LAM • General overview and motivation • Rules • Phasing • Validation • Code management • The phasing roadmap • Appendices: • Technical stuff (about VAR) Aladin/LACE/Hirlam Maintenance training workshop

  3. Software interaction IFS-Arpège // LAM • General view & motivation: • IFS evolution forces a continuous, sometimes drastic, code optimisation and cleaning • IFS provides powerful state-of-the-art software, both scientific and technological • In detail, for the LAM: observation operators are IFS, basic configurations, singular vectors, CONGRAD etc… • Sometimes, ideas are first tested in the LAM: NH model, digital filters • Yet, not every development is easily transfered from the IFS to the LAM • This « marriage » creates rights and duties Aladin/LACE/Hirlam Maintenance training workshop

  4. Software interaction IFS-Arpège // LAM • Rules or practice: • IF (LELAM) THEN; CALL ETOTO; ELSE; CALL TOTO; ENDIF • LAM-specific routines go into a separate fortran library, unseen from ECMWF • No LELAM key below the level of gridpoint scan (SCAN2MDM/TL/AD) => LRPLANE • Duplicated code must be avoided !! • The issue(s) for modularity: with respect to a functionality or a desired degree of freedom, not with respect to IFS v/s LAM • Any configuration which does have a sense for both global and LAM should not be coded as a by-product of LELAM ! Aladin/LACE/Hirlam Maintenance training workshop

  5. Software interaction IFS-Arpège // LAM • Scientific « feeling »: apply basic logic ! • Spectral space differences almost everywhere: • Mean wind vector (SPUB, SPVB) since (m=0,n=0) is not defined in bi-Fourier space • Allocations, pointers, do-loop indexes all are to be re-defined for the LAM -> most spectral routines are differentiated (eg: SUJBCOV/SUEJBCOV, SPCM/ESPCM) • Gridpoint space: more subtle: • Existence of lateral boundaries (eg: search of origin point in SL – ELARCHE) • Plane geometry projection and associated map factor (eg: SL interpolation weights – ELASCAW) • Existence of the E-zone (Extension zone for biperiodisation) • Rotation of geographical North/South and East/West with respect to model grid N/S and E/W Aladin/LACE/Hirlam Maintenance training workshop

  6. Phasing (1): practical matters • When and how long ?: • Twice per year (dates pending ECMWF/Météo-France discussions) • 3-6 weeks (visits), but in practice 2-3 months for completion in Toulouse • How many phasers ?: • 4-6 initial phasers (= visitors from partner countries), plus 2-3 additional « late » phasers • a ~ bigger investment of GMAP staff • Phaser stays are financially supported by MF, LACE or HIRLAM • Phasing is not very popular, and depends heavily on the people’s willingness to leave home … for a sacrifice • Separate with/without observations (assimilation usually comes after forecast configurations) Aladin/LACE/Hirlam Maintenance training workshop

  7. Phasing (2) • Principles: • At the very beginning: check and understand the modifications in a new IFS/Arpège cycle • Perform code and scientific analysis, and then adapt to LAM setup and/or LELAM keyed code when needed (sometimes trivial … or not) • Recode some Aladin at identical scientific content for code compliancy with Arpège • Analyze and « uncode » code clashes Aladin/LACE/Hirlam Maintenance training workshop

  8. Phasing (3) • Phasing examples: SUBROUTINE TOTO(ZTAB,K) <<changed into>> SUBROUTINE TOTO(ZTAB,K1,K2) REAL ZTAB(K) <<changed into>> REAL ZTAB(K1,K2) CALL TITI(ZTAB) <<unchanged>> SUBROUTINE ETOTO(ZTAB,K) <<changed into>> SUBROUTINE ETOTO(ZTAB,K1,K2) REAL ZTAB(K) <<changed into>> REAL ZTAB(K1,K2) CALL TITI(ZTAB) Aladin/LACE/Hirlam Maintenance training workshop

  9. Phasing (4) • Phasing examples: N is total wavenumber (Arpège)  function FKSTAR(N,M) (Aladin/LAM) SUBROUTINE TOTO WEIGHT=1.+MIN(1,M) <<inserted>> Y=X/S(N) <<changed into>> Y=WEIGHT*X/S(N) SUBROUTINE ETOTO WEIGHT=2**MIN(1,N) * 2**MIN(1,M) <<inserted>> Y=X/S(FKSTAR(N,M)) <<changed into>> Y=WEIGHT*X/S(FKSTAR(N,M)) Aladin/LACE/Hirlam Maintenance training workshop

  10. Validation • Arpège and LAM sanity-check validation is done for both at the same time : • Systematic validation of all model configurations, which do not use observation handling, is performed by the « mitraillette » tool for LAM’s: automatic launching of a number of configurations (forecast e001, TL and AD tests, fullpos, NH model, 2D plane vertical model, adiabatic or with physics, multi-processor etc…) • Basic validation of screening and 3D-VAR minimisation, ideally at the same time as Arpège 4D-VAR (needs the observation handling to be validated before) • Quality assurance (QA) tests: • After the core phasing period, since this requires again ~2 months of work (run long assimilation experiments, test various operational versions) => both at MF and in partner centers (HIRLAM, LACE) • Not all cycles are QA ! Aladin/LACE/Hirlam Maintenance training workshop

  11. Code management • Source code repository in Toulouse: clearcase • Arpège and LAM cycle numbers: CYxxTy • IFS has its own cycles in Reading (CYxxRz) • Support team for maintenance of cycles and libraries, and interfacing with operations: « GCO » -> 3 persons (2 involved in code and conf management) • User-friendly compilation environment on the high performance platforms (« gmkpack ») • Export versions are defined and made available for the Aladin/Hirlam partners (mostly for QA cycles) Aladin/LACE/Hirlam Maintenance training workshop

  12. The phasing roadmap for a common IFS-Arpège cycle • … is a Word document (check on the Aladin website or ask for it !) • Lists the sequences of tasks during phasing: • Pre-phasing coordination (list the input contributions and fine-tune the dates) • Installation of all codes under SCM and initial source code phasing; possibly some local porting of IFS version • First compilations, validations, debugging • Phasing of LAM code w/r to IFS changes • After first validations are successful, start some porting to other platforms; resume validation • Porting to ECMWF computer (usually with Hirlam) • Send new (pre-)cycle to ECMWF; check numerical performances; prepare some reporting of phasing work Aladin/LACE/Hirlam Maintenance training workshop

  13. Technical stuff Aladin/LACE/Hirlam Maintenance training workshop

  14. Global // LAM code interfacing for VAR • Architecture: obshortl Slightly different code: LELAM key coupling Completely different code Fully shared dataflow between IFS and Aladin (especially in gridpoint space), but quite separate dimensioning and addressing in spectral buffers (spherical versus bi-Fourier). Coupling code is of course only LAM. Aladin/LACE/Hirlam Maintenance training workshop

  15. Global // LAM code interfacing for VAR Jb=; Jb=2 • Simulator and model: obshortl dx=B1/2. Minimisation obsvtl cpgtl Var inner loop (SIM4D) J=Jb+Jo; J ecoupl1 einv_trans H.dx H.dx edir_trans GradJo=H*.R-1. (y-H(x)-H.dx) Jo=B1/2. GradJo espcmtl Aladin/LACE/Hirlam Maintenance training workshop

  16. Global // LAM code interfacing for VAR • Change of variable: cv2spa chavarin cvar2in sqrtbin cvaru3i jgcori ejgvcori ejghcori jgnrsi etransinv_jb cvargptl etransdir_jb ebalstat ebalvert spa1=ylvazx%lamcv*tmeanuver addbgs Aladin/LACE/Hirlam Maintenance training workshop

  17. Phasing of LAM 3D-VAR • ODB & bator need to work (almost same as Arpège, plus LAMFLAG) • At every new cycle with IFS, a careful inspection of B-matrix setup and change of variable routines, SPECTRAL_FIELDS and CONTROL_VECTOR structures, specific observation-related code is needed (~ 1 week of work). • Additionally, TL and AD LAM code may need to be checked. • LAM 3D-VAR does not use multi-incremental I/O prepared for IFS-Arpège: no WRMLPPADM/RDFPINC, no SAVMINI/GETMINI, NUPTRA>1, « traj » recomputation of innovations Aladin/LACE/Hirlam Maintenance training workshop