1 / 16

Commissioning Configuration Mark D. Baker (+ Park +Olszewski+Katzy +Wozniak + …)

Commissioning Configuration Mark D. Baker (+ Park +Olszewski+Katzy +Wozniak + …). Purpose of Comm. Run Decisions for Comm. Run Quality of Full vs CR config. Open Issues More general year-1 issues. Overview. 1/2 of 1 Vertex Detector (+Y, +Z) Choose (+Y, +Z ),

odele
Download Presentation

Commissioning Configuration Mark D. Baker (+ Park +Olszewski+Katzy +Wozniak + …)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Commissioning ConfigurationMark D. Baker (+ Park +Olszewski+Katzy +Wozniak + …) • Purpose of Comm. Run • Decisions for Comm. Run • Quality of Full vs CR config. • Open Issues • More general year-1 issues Commissioning Run Mark D. Baker

  2. Overview • 1/2 of 1 Vertex Detector (+Y, +Z) • Choose (+Y, +Z), • It will work. 1 (or 2) full detectors better. • 1/8 Octagon: arbitrarily choose: MOF* • It will work. Full octagon+rings better. • Do we want a sensor lined up with the spect.? • Spectrometer: Planes A-E (+partial G??) • A-D necessary, E (or F) exists • Year 1: Block Spectrometer for a period? Commissioning Run Mark D. Baker

  3. Proposed Vertex Detector VTB2 VTB3 VTB6 VTB7 VTA2 VTA3 Commissioning Run Mark D. Baker

  4. 1/2 Vertex works for Z=0->12cm 1 Full VTX Detector Half VTX Detector (cm) 18 16 14 12 10 8 Commissioning Run Mark D. Baker

  5. Eta coverage of Spectrometer vs. Z h Zvtx Commissioning Run Mark D. Baker

  6. Eta coverage of Spect. & VTX. h +Z VTX -Z VTX Zvtx Commissioning Run Mark D. Baker

  7. Proposed Octagon Configuration VT** P*** MOF* Commissioning Run Mark D. Baker

  8. Multiplicity Simulation Full Octagon + Rings +VTX Commissioning Config. Rec. Nch Rec. Nch N>3000 (20%) D=0.2% s=2% N>3000 (20%) D=-0.7% s=4.5% True Nch for |h<5.3| True Nch for |h<3.2| HIJING Inclusive sample, ZVTX=0 Commissioning Run Mark D. Baker

  9. Event-by-event Full Octagon + Rings +VTX Commissioning Config. HIJING+PL Central event, ZVTX=0 Commissioning Run Mark D. Baker

  10. Proposed Spectrometer Config. BDF exist AC can be built from spares. BuildAC! Commissioning Run Mark D. Baker

  11. Spectrometer • All attempts to find BDF-only tracks in high-multiplicity ER and MC events have failed! • The various successful spectrometer MC results assume perfectABCD or more. • Track finding • 3D Vertex Finding • F plane provides redundancy. It exists! Commissioning Run Mark D. Baker

  12. A Central event in PHOBOS Commissioning Run Mark D. Baker

  13. Perfect ABCD w/ VTX Rec. Ghosts @ 2% level True Commissioning Run Mark D. Baker

  14. Perfect ABCD w/o VTX Rec. True Commissioning Run Mark D. Baker

  15. B-D-F Real data - Eng. Run • BDF no VTX in MC (min. bias): • Efficiency drops to ~50%, Ghosts increase to ~30% Commissioning Run Mark D. Baker

  16. Conclusion • VTA2-3, VTB2-3, VTB6-7 • MOF* • P-arm planes: A, B, C, D, F • Build 2 more spare type 1 planes • Open questions, under active study: • Install MOA7 now? (Judith+Inkyu) • Install MOE6-8 for year 1? (Inkyu) Commissioning Run Mark D. Baker

More Related