1 / 30

Closing Remarks

Day 2 DQO Training Course Module 10. Closing Remarks. Presenter: Sebastian Tindall. 4:45 PM - 5:00 PM (15 minutes). Module 10 Closing Remarks & Final Exam. Course Objectives:. To summarize key points made today. Closing Remarks “Final Exam” Questions/feedback from the audience.

olina
Download Presentation

Closing Remarks

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Day 2 DQO Training CourseModule 10 Closing Remarks Presenter: Sebastian Tindall 4:45 PM - 5:00 PM (15 minutes)

  2. Module 10Closing Remarks & Final Exam Course Objectives: • To summarize key points made today • Closing Remarks • “Final Exam” • Questions/feedback from the audience

  3. The DQO Process • “A systematic planning process based on the scientific method for the unambiguous defining of • Environmental decision criteria • Data requirements • Error tolerances • and the documentation/preservation of these details in a consistent, standardized format providing a defensible record of the decision” • Merrick “Rick” Blancq, USACE, Portland, OR

  4. Systematic Planning Doesn’t Just “Happen” • Haphazard approaches yield haphazard results • Tactical approach to implementation • Decision makers must work together • Successful implementation model evolved as the DQO Process was used

  5. Tools Make the Job Easier • DQO e-Workbook (electronic template) • Standardized DQO Report format • DQO Web Site • DQO tools and materials • Latest version of all of today’s slides • Visual Sample Plan (VSP) • Download free software • Data Quality Assessment tools also! • Scoping Checklist

  6. Managing Uncertainty • Estimates always involve errors • Errors in estimates are not mistakes • If unmanaged, errors in estimates CAN lead to Decision Errors which ARE MISTAKES • Decision Errors must be managed • Identify • Quantify • Severe consequences of decision errors mandate a statistical basis • We are forced to make environmental decisions based on estimates

  7. Defensibility • Requires documentation • “If it isn’t written down, it didn’t happen” • Use a standardized format • We must employ the scientific method to make defensible decisions • Comes from doing good science

  8. How Many Samples do I Need? REMEMBER: HETEROGENEITY IS THE RULE!

  9. Begin With the End in Mind DATA Contaminant Concentrations in the Spatial Distribution of the Population Population Frequency Distribution Correct Equation for n (Statistical Method) , , ,  Alternative Sample Designs Optimal Sampling Design How many samples do I need? The end

  10. Logic to Assess Distribution and Calculate Number of Samples

  11. Using the LBGR to Estimate n • “Normal” FD • “Skewed” FD • Computer Simulations: “Badly skewed” or Any FD • Evaluate  and  errors to select n

  12. Must contain a clear presentation of (and the reasoning behind): Project Planning Documents • DQO Report • FSP • Quality Assurance Project Plan • HSP • Work Plan

  13. Project Planning Documents • More detailed, technical project goals/decision rules (DQOs), that will guide project decision-making • Goals for data quality (MQOs) • How sampling representativeness will be ensured, and how sampling uncertainty will be controlled • List of analytical technologies and methods • QC protocols and criteria to demonstrate that data of known quality will be generated • Description how data will be assessed and interpreted according to the decision rules • General project decision goals

  14. Uncertainty is Additive! Analytical + Sub-sampling +Natural heterogeneity of the site=Total Uncertainty Remember the uncertainty is additive for all steps in sampling and analysis

  15. Do it! (Get the job done - right) Site Closed Prove it! (Document what/why/how) Keys to success • Sound technical basis • Complete and thorough documentation

  16. FINAL EXAM • What is the Question? What is the DQO Process in a Nutshell? • What is the Population? • What is the Confidence required?

  17. TRIAD: Systematic Planning Managing Uncertainty for Environmental Decision Making Systematic Planning in Environmental Decision Making http://www.doe.hanford.gov/dqo Sebastian Tindall Bechtel Hanford Inc. 3350 George Washington Way Richland, WA 99352 (509) 372-9195 sctindal@mail.bhi-erc.com

  18. TRIAD: Dynamic Work Plans A Guideline for Dynamic Workplans and Field Analytics: The Keys to Cost-Effective Site Characterization and Cleanup http://cluin.org/char1_edu.cfm#dyna_work Albert Robbat, Jr. Tufts University, Chemistry Department Center for Field Analytical Studies and Technology Medford, Massachusetts, 02155 tel: 617-627-3474 and fax: 617-627-3443

  19. TRIAD: On-Site Analysis Applying the Concept of Effective Data to Environmental Analyses for Contaminated Sites http://cluin.org/ Deana M. Crumbling, M.S. Technology Innovation Office U.S Environmental Protection Agency 401 M Street, SW, Mail Code 5102G Washington, DC 20460 (703) 603-0643 Crumbling.Deana@epamail.epa.gov

  20. Sampling for Environmental Activities Charles “Chuck” Ramsey EnviroStat, Inc., P.O. Box 636 Fort Collins, CO 80522-0636 (970) 689-5700; Fax: (970) 229-9977 envirostat@home.com

  21. DQO Consultants:Preparation & Facilitation Mitzi Miller Environmental Quality Management (EQM) 1777 Terminal Drive Richland, WA 99352 (509) 946-4985; Fax: (509) 946-4595 eqmmitzi@owt.com

  22. DQO Consultants:Preparation & Facilitation Al Robinson Environmental Quality Management (EQM) 1777 Terminal Drive Richland, WA 99352 (509) 946-4985; Fax: (509) 946-4595 eqmmitzi@owt.com

  23. DQO Consultants:Environmental Statistics Jim Davidson Davidson and Davidson, Inc. 8390 Gage Blvd., Suite 205 Kennewick, WA 99336 (509) 374-4498; davidson@owt.com

  24. DOE EM-5/NAMP Sponsored Web Pages http:/www.hanford.gov/dqo/ http://dqo.pnl.gov/ http://www.em.doe.gov/safetyhealth/3d/

  25. DQO Training Points of Contact DQO Process Expert Sebastian TindallProgram ManagerBechtel Hanford Inc. 3350 George Washington WayRichland, WA 99352(509) 372-9195sctindal@mail.bhi-erc.com Visual Sample Plan James R. Davidson, Jr. Davidson and Davidson, Inc. 8390 Gage Blvd., Suite 205 Kennewick, WA 99336 Tel: (509) 374-4498 davidson@owt.com

  26. Program POCs Sebastian TindallProgram ManagerBechtel Hanford Inc. 3350 George Washington WayRichland, WA 99352(509) 372-9195sctindal@mail.bhi-erc.com Brent PulsipherProgram ManagerPacific Northwest National Laboratories.2400 Stevens DriveRichland, WA 99352(509) 375-3989 brent.pulsipher@pnl.gov Elizabeth M. BowersDepartment of Energy/Richland Operations Office825 Jadwin AvenueRichland, WA 99352(509) 373-9276Elizabeth_M_Liz_Bowers@rl.govDave BottrellDepartment of Energy/EM-5/NAMP19901 Germantown RoadCloverleaf BuildingRoom 1078Germantown, MD 20874-1290(301) 903-7251 david.bottrell@em.doe.gov

  27. Day 2 Training Credits • Susan Blackburn, SAIC, Richland, WA • Dave Blumenkranz, SAIC, Richland, WA • Mitzi Miller, EQM, Richland, WA & Knoxville, TN • Al Robinson, EQM, Richland, WA • Kelly Black, Neptune and Associates, Denver, CO • Candy Hawk, Blue Sky Software, Richland, WA • Mike Schwab, Bechtel Hanford, RL, WA • Surajit Amrit, Bechtel Hanford, RL, WA

  28. VSP Acknowledgements John Wilson, PNNL Dick Gilbert, Nancy Hassig, Tim Schiebe, PNNL Don Singer, USGS Brent Pulsipher, PNNL

  29. How Many Samples do I Need? REMEMBER: HETEROGENEITY IS THE RULE!

  30. End of Day 2 Course Please take a few minutes to fill out and turn in all the course evaluation forms. Thank you for your attention today. Questions? Feedback?

More Related