1 / 4

Heteroscedasticity

Heteroscedasticity. What does it mean? The variance of the error term is not constant What are its consequences ? Heteroscedasticity does not destroy the unbiasedness and consistency properties of OLS estimators The least squares results are no longer efficient: NOT BLUE;

oliver
Download Presentation

Heteroscedasticity

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Heteroscedasticity What does it mean? The variance of the error term is not constant What are its consequences?Heteroscedasticity does not destroy the unbiasedness and consistency properties of OLS estimators • The least squares results are no longer efficient: NOT BLUE; • the formulae used to estimate the coefficient standard error are no more correct; • t tests and F tests results may be misleading; (if the error variance is positively related to an independent variable then the estimated standard errors are biased downwards and hence the t-values will be inflated); - confidence intervals based on these standard errors will be wrong - In the presence of heteroscedasticity, the variances of OLS estimators are not provided by the usual OLS formulas

  2. Heteroscedasticity How can you detect the problem?Plot the residuals against each of the regressors or use one of the more formal tests (White’s test, Breusch-Pagan-Godfrey test, Goldfeld-Quandt test, etc) - How to select test? We cannot tell for sure which will work in a given situation; pay attention to several factors (e.g. level of significance, the probability of rejecting a false hypothesis, sensitivity to outlies How can I remedy the problem?Respecify the model – look for other missing variables; perhaps take logs or choose some other appropriate functional form; or make sure relevant variables are expressed “per capita” • If the sample is large use White’s heteroscedasticity corrected standard errors for OLS estimators • - make educated guesses of the likely pattern of heteroscedasticity and transform the original data in a such a way that in the transformed data there is no heteroscedasticity and then use OLS estimates

  3. Autocorrelation What is meant by autocorrelation The error terms are not independent from observation to observation – ut depends on one or more past values of u What are its consequences? The least squares estimators remain unbiased, consistent an asymptotically normally distributed but they are no longer “efficient” (i.e. they don’t have the lowest variance). Consequently the standard errors and t-values will be also affected. t, F and X2 tests cannot be applied If there is positive autocorrelation the standard errors will be underestimated and t-values will biased upwards The variance of the error term will also be underestimated under positive autocorrelation so that R square will be exaggerated Forecasts based on the OLS regression model will be inefficient (they have larger variances than these from other techniques) More seriously autocorrelation may be a symptom of model misspecification

  4. Autocorrelation How can you detect the problem? Plot the residuals against time or their own lagged values, calculate the Durbin-Watson statistic or use some other tests of autocorrelation such as the Breusch-Godfrey test How can you remedy the problem?The remedy depends on the nature of the interdepedence among the disturbances ut Consider possible model re-specification of the model: a different functional form,missingvariables, lags etc. The common practice is to assume that they are generated by some mechanism, e.g. the first-order autoregressive scheme (it assumes that the disturbance in the current time period is linearly related to the disturbance term in the previous time period) If AR(1) scheme is valid and the coefficient of autocorrelation is known then transform the data through GLS procedure

More Related